Piney Point/st. George 's Island Force Main Replacement Phase 1 RFP

Description: Work includes replacement of approximately 14,660 LF of 8-inch ductile iron pipe (dip) force main with 8-inch high-density polyethylene (hdpe) force main and the replacement of approximately 1,000 LF of 3-inch piping with 3-inch sch 40 316ss piping with insulation and all components to provide a complete system. The replacement 8-inch force main will be installed via open cut and/or horizontal directional drilling (hdd) and the twin 3-inch force main replacement is a bridge crossing.