Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
North Charleston Sewer District
Work includes approx. 334 LF of 8" PVC sanitary sewer (SDR 26) installed; 334 LF of remove existing 8" sewer; 150 CY of trench excavation and backfill (non-flowable); 1 LS of bypass pumping (6" system) if applicable; 10 EA of sewer service reconnections; 10 EA of service cleanouts (at easement line).
Posted Date
May 21, 2026
Due Date
Jun 1, 2026
Release: May 21, 2026
North Charleston Sewer District
Close: Jun 1, 2026
Work includes approx. 334 LF of 8" PVC sanitary sewer (SDR 26) installed; 334 LF of remove existing 8" sewer; 150 CY of trench excavation and backfill (non-flowable); 1 LS of bypass pumping (6" system) if applicable; 10 EA of sewer service reconnections; 10 EA of service cleanouts (at easement line).
AvailableNorth Charleston Sewer District
Work includes approx 1 LS pump station modification.
Posted Date
May 6, 2026
Due Date
May 28, 2026
Release: May 6, 2026
North Charleston Sewer District
Close: May 28, 2026
Work includes approx 1 LS pump station modification.
North Charleston Sewer District
Upgraded with the replacement of the standby generator, and installation of new electrical equipment, controls, and the generator on a new raised platform to flood-proof the pump station. Work will include construction of the raised concrete platform, installation of an owner-provided generator, and electrical equipment. The site improvements will include demolition and removal of the existing generator, pad, access stairs and platform, minor grading, and construction of a small section of concrete sidewalk.
Posted Date
May 12, 2026
Due Date
Jun 16, 2026
Release: May 12, 2026
North Charleston Sewer District
Close: Jun 16, 2026
Upgraded with the replacement of the standby generator, and installation of new electrical equipment, controls, and the generator on a new raised platform to flood-proof the pump station. Work will include construction of the raised concrete platform, installation of an owner-provided generator, and electrical equipment. The site improvements will include demolition and removal of the existing generator, pad, access stairs and platform, minor grading, and construction of a small section of concrete sidewalk.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge