Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 688 CY excavation, channel, 316 CY excavation, channel, waste, 187 SY subbase, modified, 12 in, 72 LF sewer pipe encasement, 19 LF storm sewer, trenched, rcp, class III, 24 in, 1 EA pipe apron, concrete, 24 in. W/ apron guard and footing, 32 lf removal of storm sewer less than or equal to 24 in, 165 LF tile, pvc, unspecified diameter, remove, relocate , and reconnect, manhole, storm sewer, sw-401, 48 in (EA). See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project includes restoration of stone masonry wingwalls, stabilization of embankment erosion along Rock Run, and replacement of an existing timber pedestrian bridge deck.
Posted Date
Dec 31, 2025
Due Date
Feb 17, 2026
Release: Dec 31, 2025
Close: Feb 17, 2026
The project includes restoration of stone masonry wingwalls, stabilization of embankment erosion along Rock Run, and replacement of an existing timber pedestrian bridge deck.
AvailableProvide emergency watershed protection streambank stabilization project.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
Provide emergency watershed protection streambank stabilization project.
AvailableFlume creek culvert replacement and channel restoration.
Posted Date
Jan 2, 2026
Due Date
Jan 30, 2026
Release: Jan 2, 2026
Close: Jan 30, 2026
Flume creek culvert replacement and channel restoration.
AvailableMeadows Northland Arlington Street Stabilization Project is an Invitation for Bid (Bid 7-2026) issued by Lexington-Fayette Urban County for street stabilization work. The solicitation was issued on 2026-01-15 and bids are due on 2026-02-05 at 2:00 PM ET, with questions due by 2026-01-28 at 12:00 PM ET. Bid documents (a bid package PDF and an Excel bid schedule) are listed on the buyer's procurement portal but require login/registration to download.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
Meadows Northland Arlington Street Stabilization Project is an Invitation for Bid (Bid 7-2026) issued by Lexington-Fayette Urban County for street stabilization work. The solicitation was issued on 2026-01-15 and bids are due on 2026-02-05 at 2:00 PM ET, with questions due by 2026-01-28 at 12:00 PM ET. Bid documents (a bid package PDF and an Excel bid schedule) are listed on the buyer's procurement portal but require login/registration to download.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis