Friendship Park Restroom Project RFP
Work inlcudes construction of a single-story cmu blocked restroom facility.
Description: Construction of restroom and park improvements at Pickleweed Park, including demolition of the existing restroom and installation of a prefabricated public restroom, foundation, utility connections, and associated site amenities.
City · CA, US
Adjacent opportunities open for bidding right now.
CityMS
Posted
Oct 29, 2026
Nov 30, 2026
Work inlcudes construction of a single-story cmu blocked restroom facility.
CountyNY
Posted
Nov 2, 2026
Jan 13, 2027
The Village of Youngstown, acting through its Village Board of Trustees, seeks sealed proposals from qualified, licensed general contractors to build a new single-story, ADA-compliant, wood-framed public restroom building with a vinyl siding exterior at Falkner Park. The work includes site, structural, architectural, plumbing, electrical, and site-improvement work, and attendance at a mandatory pre-bid site visit on November 16, 2026 is required. Sealed proposals must be received at the Village Clerk’s Office by January 13, 2027; the drawings, specifications, and bid forms are available from that office.
CityAZ
Posted
Oct 21, 2026
Nov 30, 2026
Work includes remove existing restroom fixtures, accessories, and finishes as required; remove and dispose of demolition materials; protect surrounding park facilities and public areas; remove and replace existing plumbing fixtures; install new commercial-grade stainless steel fixtures;replace faucets, valves, flush valves, and associated components; repair plumbing deficiencies discovered during construction (with city approval); replace existing lighting with led fixtures; replace switches, sensors, and electrical components as required; ensure all electrical work meets current code requirements. See attached file.
OtherPA
Posted
Nov 17, 2026
Dec 1, 2026
Active Adult Center Men's Restroom Project.
Decision makers connected to this RFP from City of San Rafael.
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
179 days before RFP
City staff reported that the Pickleweed Park restroom replacement was awaiting building-permit approval after floodproofing-compliance redesign, with solicitation planned for Spring 2026.
PICKLEWEED PARK RESTROOM REPLACEMENT This project is a continuation of the Pickleweed Park Enhancement project. The existing park restroom Page 3 of 8 is heavily utilized and approaching end of life. While replacement of the restroom was originally included in the project scope for the Enhancements Project, the City identified that the new facility required…
Park and Recreation Commission Meeting Agenda And Minutes
Agenda packet · May 21, 2026
Agenda packet
179 days before RFP
City Council approved the LWCF grant application in 2022, and the City and State of California signed an agreement in 2024 approving the City's use of $4.24 million in LWCF grant funds for the Pickleweed Park Enhancement Project.
PICKLEWEED PARK ENHANCEMENTS The Pickleweed Park Enhancement Project has been a community priority for more than a decade; located in the Canal neighborhood, the Pickleweed Park fields and amenities are heavily utilized by the community. In 2022, City Council approved the Land and Water Conservation (LWCF) grant application for this project, which detailed…
Park and Recreation Commission Meeting Agenda And Minutes
Agenda packet · May 21, 2026
Board meeting
166 days before RFP
Pickleweed Advisory Committee received a report that the Pickleweed Park restroom bid was out, with associated nets, bleachers, and benches included and off-site restroom fabrication expected to take six to nine months after acceptance.
park restroom is out to bid. So, that bid went out separately. It was initially part of the full park renovation and then got u broken off separately due to some other uh requirements, some specialized requirements that the restroom had. Um that is out to bid. Um, we did tie into that bid as well, um, ball catching nets to be put up on the main goals of the…
Pickleweed Advisory Committee Regular Meeting
Board meeting · Jun 3, 2026
Board meeting
60 days before RFP
City staff planned to replace the end-of-life Pickleweed Park restroom with a dry-floodproofed facility and refresh the adjacent picnic site, with design about 95% complete and bidding approaching.
that project is in motion. Um the Pickle Park restroom, I did want to share that um we we did close that restroom recently. Um you may be aware there was a there was a um a water supply leak there that we've been aware of for a while. Um and we had opted to continue to have that restroom open in spite of that because we felt it was really important for that…
RFP published
Proposals due (19 days left)
Parks and Recreation Commission Regular Meeting
Board meeting · Sep 17, 2026