Open RFP

Physical Security Update RFP

Description: In general, the work consists of: demolition and removal of existing physical barrier system, and construction of a dual vertical drop arm crash beams. The beams are operated electronically with a primary control panel located inside Headquarters and a secondary control panel located inside the existing guard booth. The project also includes the installation of a new street lighting circuit, concrete curb and gutter, concrete sidewalk, concrete pavement, and asphalt pavement. See attached files and outside link.

Buyer
Released
Jul 31, 2026
Closes
Sep 15, 2026(41 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts