Summary
Maidencreek Township Authority is soliciting sealed bids for modifications to the Phillips’ Farm Municipal Campus Water Treatment Facility basin, including conversion of an existing stormwater infiltration basin to an MRC bioretention basin, outlet-structure modifications, grading, and construction of a detention basin. The solicitation is an open fixed-fee RFB, with a non-mandatory pre-bid conference scheduled for July 28, 2026, and questions due August 11, 2026. Bids are due August 18, 2026, at 2:00 PM prevailing time, and the apparent low bidder will be considered at the Authority’s August 20, 2026 meeting.