Summary
The Phillips Farm Municipal Campus Water Treatment Facility Basin Modifications Project is a construction solicitation issued by the Mercersburg Water Authority in Pennsylvania. The project generally consists of modifying an existing stormwater infiltration basin to an MRC Bioretention Basin, removal of storm sewer pipe discharging into the existing basin, modifications to the existing basin outlet structure, grading and installation of a detention basin, and construction of an outlet structure to direct runoff into the MRC Basin and proposed Detention Basin. The solicitation was posted on July 20, 2026 and bids remain open for approximately 30 days.