Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Schedule 1 - sewer main replacement: replacement of approx., 8,400 LF of sewer main and associated appurtenances and schedule 2 - lift station: installation of a new east frontage road lift station and associated appurtenances. Bids are requested for the following contract: phase 3C wastewater collection system improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes comprehensive improvements to the lift station, the wastewater treatment plant (wwtp), and the sanitary sewer system. At the lift station, work will involve installing a new level transducer with associated electrical and controls, replacing the control panel, and adding a permanent natural gas generator with an automatic transfer switch. Additional upgrades include the installation of bollards, a new submersible pump, a precast concrete top on the wet well with a new access hatch and fall protection, and a davit crane for safe equipment handling. At the wwtp, the scope includes removing existing chlorine disinfection equipment, making minor structural modifications, and installing a new ultraviolet disinfection system.
Posted Date
Dec 4, 2025
Due Date
Feb 25, 2026
Release: Dec 4, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 25, 2026
Work includes comprehensive improvements to the lift station, the wastewater treatment plant (wwtp), and the sanitary sewer system. At the lift station, work will involve installing a new level transducer with associated electrical and controls, replacing the control panel, and adding a permanent natural gas generator with an automatic transfer switch. Additional upgrades include the installation of bollards, a new submersible pump, a precast concrete top on the wet well with a new access hatch and fall protection, and a davit crane for safe equipment handling. At the wwtp, the scope includes removing existing chlorine disinfection equipment, making minor structural modifications, and installing a new ultraviolet disinfection system.
AvailableProvide Construction Management Services for Wastewater Treatment Facility Expansion - Phase 3A, 3C, and 3D Projects.
Posted Date
Nov 24, 2025
Due Date
Feb 4, 2026
Release: Nov 24, 2025
Close: Feb 4, 2026
Provide Construction Management Services for Wastewater Treatment Facility Expansion - Phase 3A, 3C, and 3D Projects.
Work includes improvements to the town's existing wastewater treatment plant (wwtp) and collection system, the wwtp work includes but is not limited to conversion of the existing sludge digester to a new sequential batch reactor (sbr) with new diffused aeration equipment, new sbr blowers with vfd's and dissolved oxygen (do) control, backup sbr control system, structural improvements to the existing concrete tanks, conversion of the existing chlorine contact tank to a new uv disinfection tank, new effluent pump station with new force main and outfall structure, the collection system work includes but is not limited to replacing the existing lift station with a new submersible lift station, wet well, valve pit, electrical, controls, cloud-based monitoring system, and replacement of the existing force main.
Posted Date
Dec 10, 2025
Due Date
Feb 17, 2026
Release: Dec 10, 2025
Close: Feb 17, 2026
Work includes improvements to the town's existing wastewater treatment plant (wwtp) and collection system, the wwtp work includes but is not limited to conversion of the existing sludge digester to a new sequential batch reactor (sbr) with new diffused aeration equipment, new sbr blowers with vfd's and dissolved oxygen (do) control, backup sbr control system, structural improvements to the existing concrete tanks, conversion of the existing chlorine contact tank to a new uv disinfection tank, new effluent pump station with new force main and outfall structure, the collection system work includes but is not limited to replacing the existing lift station with a new submersible lift station, wet well, valve pit, electrical, controls, cloud-based monitoring system, and replacement of the existing force main.
AvailableThe City of Dorris is soliciting sealed bids for the Wastewater Treatment & Collection Improvements project, which includes constructing a new wastewater treatment plant, rehabilitating an existing sewer lift station, replacing a pressure sewer main, and addressing problematic sewer main locations along with miscellaneous sewer system items. Bids are due at Dorris City Hall by 1:00 p.m. local time on March 4, 2026, when they will be publicly opened and read. The engineer’s estimate is approximately $4,950,000 and the work must be completed within 730 calendar days.
Posted Date
Jan 7, 2026
Due Date
Mar 4, 2026
Release: Jan 7, 2026
Close: Mar 4, 2026
The City of Dorris is soliciting sealed bids for the Wastewater Treatment & Collection Improvements project, which includes constructing a new wastewater treatment plant, rehabilitating an existing sewer lift station, replacing a pressure sewer main, and addressing problematic sewer main locations along with miscellaneous sewer system items. Bids are due at Dorris City Hall by 1:00 p.m. local time on March 4, 2026, when they will be publicly opened and read. The engineer’s estimate is approximately $4,950,000 and the work must be completed within 730 calendar days.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →