Phase 3 Storm Sewer Relief Main
Construction of storm sewer relief main. Work includes 500 LF of 84" dia steel pipe casing; 86 LF of 84" double RCP pipe; 2 EA 4' dia mnahole; 7 VF 4' dia extra depth manhole wall; 460 LF of temporary silt fence; 3,700 SY of solid slab sodding. See outside link.