CityOH
Posted
Nov 7, 2026
Nov 24, 2026
South Street Reconstruction Phase 2 RFP
Work include reconstruction of south street from main to sycamore street, including replacement of asphalt, curb, sidewalk, storm sewer, and water.
Description: Work consisting of removal and replacement of approximately 1300 LF of concrete sidewalk, concrete bench aprons with garbage receptacles, concrete curb and gutter and associated drainage piping and catch basins, cleaning and painting of existing walk bridge railings, earthwork shaping and grading, hydroseeding, etc. including all necessary labor, materials, equipment, tools, etc.
City · LA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Jennings.
Adjacent opportunities open for bidding right now.
CityOH
Posted
Nov 7, 2026
Nov 24, 2026
Work include reconstruction of south street from main to sycamore street, including replacement of asphalt, curb, sidewalk, storm sewer, and water.
CityTX
Posted
Oct 16, 2026
Dec 3, 2026
Work consists of the reconstruction of Chapman Street from Augusta Street to Curry Drive, the entire length of Independence Drive, and Bartlett Place from cul-de-sac to Clover Valley Dr. The work includes, but is not limited to, mobilization, preparation of right-of-way, traffic control, approximately 16,200 SY of 6-inch thick reinforced concrete pavement on flex base subgrade, and approximately 40,000 SF of 4-inch thick reinforced concrete sidewalks, approx. 2,300 LF of 8-inch diameter sanitary sewer, 1,100 LF of 18-inch diameter sanitary sewer, 4,400 LF of 8-inch water line, and any other work deemed necessary by the City.
CityIL
Posted
Oct 27, 2026
Nov 18, 2026
Work will include site removals and clearing, construction fencing, temporary soil erosion and sediment control measures and maintenance, earthwork, asphalt paving, parking lot striping, concrete curbs, walks, footings; stone paving and stone outcropping, ballfield equipment installation, splash pad equipment installation, fitness equipment installation, drinking fountain installation, concrete bag toss board installation, installation of site furnishings, pour-in-place rubber surfacing, site utilities (water and storm), engineered wood fiber path, chain link fencing, backstop, and gates, batting cage installation, ballfield netting, ballfield infield, dugout installation, shelter installation, landscape planting, native planting, woodland seeding and plugs, and turf seeding.
Posted
-
Dec 10, 2026
Phase (2) includes the construction of a new skate park to replace the existing skate park located at 4 Helmsman Way, as well as the construction of a new pump track.