CountyFL
Posted
Oct 16, 2026
Nov 16, 2026
CDBG-DR HS020 New Century Community Shelter Project Phase 2 - Building Construction RFP
Work includes selective removal and modification of existing construction required for the renovated gymnasium and connection to the new addition; protection, temporary support, shoring, bracing, and weather protection of existing construction designated to remain;repair and restoration of existing surfaces disturbed by demolition, utility work, structural modifications, and new construction; gymnasium floor preparation and new wood athletic/sports flooring where indicated; new and modified wall, ceiling, finish, door, hardware, glazing, signage, and specialty work associated with the renovated space; gymnasium equipment interfaces, including sleeves and infrastructure for owner-furnished floor mounted equipment where indicated;. See attached file.
