Open RFP

Peters Pipeline Control Vault Replacement

Description: Stockton East Water District seeks a contractor to excavate and backfill and sawcut the existing 60" RCP for the Peters Pipeline control vault replacement. The work includes installing a new cast-in-place concrete control vault with a spill wall, replacing the existing air vent with a concrete collar, and installing new grating, ladders, and hand railing. The contractor must also install a new 60" slide gate supplied by the District.

Buyer
Stockton East Water District

SpecialDistrict · CA, US

Released
Oct 29, 2026
Closes
Nov 30, 2026(22 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts