Rice Bridge Replacement in the Township of Trescott (Request for Information)
Work includes bridge replacement. Description: 1 ls of removing existing bridge; 350 sy of removing pavement surface; 690 cy of common excavation; 67 cy of rock excavation; 50 cy of common borrow; 270 cy of granular borrow; 350 cy of structural earth excavation - major structures; 100 cy of structural rock excavation - major structures; 740 cy of aggregate subbase course-gravel; 129 ton of hot mix asphalt 12.5 mm hma surface; 167 ton of hot mix asphalt 12. 5 mm base; 120 ton of temporary pavement; 1 ls of structural concrete, abutments and retaining walls; 199 cy of structural concrete, abutments and retaining walls(placed under water). See attached file.