Closing soon

Rice Bridge Replacement in the Township of Trescott (Request for Information)

Description: Work includes bridge replacement. Description: 1 ls of removing existing bridge; 350 sy of removing pavement surface; 690 cy of common excavation; 67 cy of rock excavation; 50 cy of common borrow; 270 cy of granular borrow; 350 cy of structural earth excavation - major structures; 100 cy of structural rock excavation - major structures; 740 cy of aggregate subbase course-gravel; 129 ton of hot mix asphalt 12.5 mm hma surface; 167 ton of hot mix asphalt 12. 5 mm base; 120 ton of temporary pavement; 1 ls of structural concrete, abutments and retaining walls; 199 cy of structural concrete, abutments and retaining walls(placed under water). See attached file.

Released
Aug 12, 2026
Closes
Sep 2, 2026(9 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts