Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of approx 70lf 14" internally restrained ductile iron pipe and associated fittings. Installation of approx 40lf 16" internally restrained ductile iron pipe and associated fittings. Grout fill and abandonment of approx 165lf 14 c900 pipe and associated fittings. Removal of approx 20lf 14" c900 pipe and associated fittings. Saw cutting, temporary pavement patching, placement and compaction of bedding sand and backfill materials, permanent pavement patching, 2" mill and overlay, slurry seal, and traffic control associated with the installation of the proposed pipelines and services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Reclaim Water Main Relocation for the NeoCity Academy Project. To include but not limited to: Direction drill approx. 600 LF of 8” DR11 HDPE piping along Neo-City Way, reconnection of lateral services as indicated.
Posted Date
Dec 9, 2025
Due Date
Feb 4, 2026
Release: Dec 9, 2025
Close: Feb 4, 2026
Reclaim Water Main Relocation for the NeoCity Academy Project. To include but not limited to: Direction drill approx. 600 LF of 8” DR11 HDPE piping along Neo-City Way, reconnection of lateral services as indicated.
The University of North Carolina at Pembroke is soliciting design and construction administration services for the Campus Water Main Infrastructure Replacement Phase III to replace and rehabilitate aging underground campus water mains. Scope includes selective demolition and excavation, installation of new water main piping and appurtenances, and restoration of paving and landscaping. The project budget is estimated at $600,000 and requires proposers to be licensed for architectural or engineering services in North Carolina.
Posted Date
Jan 23, 2026
Due Date
Feb 17, 2026
Release: Jan 23, 2026
Close: Feb 17, 2026
The University of North Carolina at Pembroke is soliciting design and construction administration services for the Campus Water Main Infrastructure Replacement Phase III to replace and rehabilitate aging underground campus water mains. Scope includes selective demolition and excavation, installation of new water main piping and appurtenances, and restoration of paving and landscaping. The project budget is estimated at $600,000 and requires proposers to be licensed for architectural or engineering services in North Carolina.
The project includes approx 260 LF of 6" diameter DR-14 PVC water main; 200 LBS of Ductile iron fittings; 50 Cy of rock excavation; 41 LF of 12" Direct Bury steel encasement.
Posted Date
Jan 20, 2026
Due Date
Feb 3, 2026
Release: Jan 20, 2026
Close: Feb 3, 2026
The project includes approx 260 LF of 6" diameter DR-14 PVC water main; 200 LBS of Ductile iron fittings; 50 Cy of rock excavation; 41 LF of 12" Direct Bury steel encasement.
Provide for the installation of approx. 2,260 LF of 12" ductile iron water main with restrained joints and 35 LF of 8" ductile iron water main with restrained joints installed on Windsor Street between Sanford Street to Main Street. The transfer of 19 water services smaller than 4", the transfer of 14 water services greater than 4-inches, and removal and replacement of 6 fire hydrant assembly on Windsor Street. Abandonment of approx. 2,000 LF of existing water main on Windsor Street and Sanford Street. Abandonment of approx. 1,300 LF an existing 6-inch water main on the east side of Main Street, from Windsor Street to Montville Street including the transfer of 10 water services smaller than 4", the transfer of 7 water services greater than 4", and removal and replacement of 1 fire hydrant assembly.
Posted Date
Jan 30, 2026
Due Date
Mar 30, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide for the installation of approx. 2,260 LF of 12" ductile iron water main with restrained joints and 35 LF of 8" ductile iron water main with restrained joints installed on Windsor Street between Sanford Street to Main Street. The transfer of 19 water services smaller than 4", the transfer of 14 water services greater than 4-inches, and removal and replacement of 6 fire hydrant assembly on Windsor Street. Abandonment of approx. 2,000 LF of existing water main on Windsor Street and Sanford Street. Abandonment of approx. 1,300 LF an existing 6-inch water main on the east side of Main Street, from Windsor Street to Montville Street including the transfer of 10 water services smaller than 4", the transfer of 7 water services greater than 4", and removal and replacement of 1 fire hydrant assembly.
Available