Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide for the installation of approx. 2,260 LF of 12" ductile iron water main with restrained joints and 35 LF of 8" ductile iron water main with restrained joints installed on Windsor Street between Sanford Street to Main Street. The transfer of 19 water services smaller than 4", the transfer of 14 water services greater than 4-inches, and removal and replacement of 6 fire hydrant assembly on Windsor Street. Abandonment of approx. 2,000 LF of existing water main on Windsor Street and Sanford Street. Abandonment of approx. 1,300 LF an existing 6-inch water main on the east side of Main Street, from Windsor Street to Montville Street including the transfer of 10 water services smaller than 4", the transfer of 7 water services greater than 4", and removal and replacement of 1 fire hydrant assembly.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replace concrete terrazzo, phase 2.
Posted Date
-
Due Date
Feb 4, 2026
Release: -
Close: Feb 4, 2026
Replace concrete terrazzo, phase 2.
About 10,000 LF of 8" water main replacement; 4,400 SY of 9" base concrete with 1.5" Asphalt surface, including valves, hydrants and pavement restoration.
Posted Date
Jan 22, 2026
Due Date
Feb 9, 2026
Release: Jan 22, 2026
Close: Feb 9, 2026
About 10,000 LF of 8" water main replacement; 4,400 SY of 9" base concrete with 1.5" Asphalt surface, including valves, hydrants and pavement restoration.
AvailableThis RFP is for the replacement of approximately 5,400 linear feet of water main with new 10-inch PVC water main and associated roadway, swale, and shoulder restoration.
Posted Date
Jan 22, 2026
Due Date
Mar 5, 2026
Release: Jan 22, 2026
Close: Mar 5, 2026
This RFP is for the replacement of approximately 5,400 linear feet of water main with new 10-inch PVC water main and associated roadway, swale, and shoulder restoration.
AvailableProcurement for the construction of the Jordan Road Phase 3 Force Main and Sewer Pump Station.
Posted Date
-
Due Date
Feb 6, 2026
Close: Feb 6, 2026
Procurement for the construction of the Jordan Road Phase 3 Force Main and Sewer Pump Station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis