CityVT
Posted
Sep 3, 2026
Sep 18, 2026
Pelots Point Road Lakeshore Stabilization
The Town of North Hero invites qualified contractors to prepare bids for the Pelots Point Road Lakeshore Stabilization Project along Lake Champlain in North Hero, Vermont. The approximately 150-foot project calls for bioengineered shoreline measures including encapsulated soil lifts, stone toe protection, plantings, grading, and site restoration to stabilize erosion threatening Pelots Point Road while adding water-quality and habitat benefits. The portal classifies it as a Request for Quotation rather than a grant-program application, and lists an Open Date of 9/3/2026 and a Closing Date of 9/18/2026 at 5:00 PM.