CityMS
Posted
Nov 18, 2026
Dec 22, 2026
Pedestrian and Ada Improvements Along Constitution Avenue RFP
Work inlcudes pedestrian and ada improvements.
Description: Work inlcudes traffic signal replacements, pedestrian lighting, pedestrian sidewalk and ada ramp improvements.
City · MS, US
Adjacent opportunities open for bidding right now.
CityMS
Posted
Nov 18, 2026
Dec 22, 2026
Work inlcudes pedestrian and ada improvements.
CityCA
Posted
Oct 29, 2026
Dec 9, 2026
2 ea tree demolition; 340 CY roadway excavation, cut, and removal; 14 CY bus shelter and bus bench excavation; 438 LF install type c concrete curb; 28 SF concrete driveway (t=6").
CityME
Posted
Nov 9, 2026
Dec 9, 2026
Pedestrian Improvements on Eastern Avenue WORK INCLUDES Remove portions of the existing shoulder and sidewalk; Construct concrete bump outs with ADA approved ramps and landings; Reconstruct sidewalk areas; Install Rectangular Rapid Flashing Beacons; Mill/Shim and pave surface to control surface water; And, any other work described in the Contract Documents.
CityVA
Posted
Nov 19, 2026
Jan 19, 2027
Construction of storm drainage pipes and structures, concrete sidewalks, curbing, ramps and other associated roadside and right-of-way improvements along Jefferson Street, Luck Avenue and Franklin Road. Traffic Signal Modifications at the intersection of Jefferson Street and Franklin Road.
Decision makers connected to this RFP from City of Meridian.
Solicitation files and supporting documents for this bid.