Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Parc phase i will include 3,200 LF of channel widening. Project will include approximately 100,000 CY of excavation and approximately 90,000 SF of mse wall intended to reduce flooding and promote downtown development.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Create a multifunctional corridor. Construction of an approximately half-mile long multi-functional corridor parallel to and crossing laguna creek. The multi-functional corridor will be elevated above existing ground surface elevation by approximately 2 feet. The surface of the corridor will include a 10-foot-wide paved surface with 2-feet wide decomposed granite shoulders. Post-and-cable fencing will be installed at the edges of the unpaved shoulders. Two prefabricated steel truss bridges with concrete decks will provide necessary access across laguna creek. Additional project features include construction of two floodway excavation areas to offset the floodplain encroachments from the elevated multi-functional corridor. See outside link.
Posted Date
Dec 18, 2025
Due Date
Feb 17, 2026
Release: Dec 18, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 17, 2026
Create a multifunctional corridor. Construction of an approximately half-mile long multi-functional corridor parallel to and crossing laguna creek. The multi-functional corridor will be elevated above existing ground surface elevation by approximately 2 feet. The surface of the corridor will include a 10-foot-wide paved surface with 2-feet wide decomposed granite shoulders. Post-and-cable fencing will be installed at the edges of the unpaved shoulders. Two prefabricated steel truss bridges with concrete decks will provide necessary access across laguna creek. Additional project features include construction of two floodway excavation areas to offset the floodplain encroachments from the elevated multi-functional corridor. See outside link.
AvailablePedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Pedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
AvailableThe City of DeSoto and the DeSoto Development Corporation (DDC) seek qualified master developers for the redevelopment of the northwest and southwest quadrants at Hampton Road and Belt Line Road in DeSoto, Texas. The scope includes comprehensive master development services for approximately 24 acres (SW) and 8.5 acres (NW), with in‑person responses due by the stated deadline.
Posted Date
Nov 14, 2025
Due Date
Jan 20, 2026
Release: Nov 14, 2025
Close: Jan 20, 2026
The City of DeSoto and the DeSoto Development Corporation (DDC) seek qualified master developers for the redevelopment of the northwest and southwest quadrants at Hampton Road and Belt Line Road in DeSoto, Texas. The scope includes comprehensive master development services for approximately 24 acres (SW) and 8.5 acres (NW), with in‑person responses due by the stated deadline.
AvailablePedestrian and bicycle improvements project. The work involves pavement rehabilitation using a warm mix asphalt overlay, installation of bicycle lanes, sidewalk reconstruction, curb installation, and drainage improvements.
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
Pedestrian and bicycle improvements project. The work involves pavement rehabilitation using a warm mix asphalt overlay, installation of bicycle lanes, sidewalk reconstruction, curb installation, and drainage improvements.