Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project involves the installation of approx. 600 meters of buried conduit, 600 meters of single mode 9/125, loose tube, gel filled, 6 strand fiber optic cable and up to 12 vaults connect the headquarters building with the visitor center and repair the break in fiber optics located at the entrance.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes specialized horizontal boring installation of approximately 3,128 linear feet of new fiber optic cable and all necessary supporting equipment across five key municipal sites. Traffic control; pot holing; 3128 lf stitch bore, 2" conduit (intterduct ribbed/lubricated); 3128 ft place 48 fiber - city hall to market building - proofing and placement; 2 ea place 48 fiber fdu rack; 3128 ft place #10 locate wire; 20 ea terminate fiber optic cable strand; 5 ea place #6 pull box standard; 7 ea place #6 pull box w/steel lid - traffic rated; 2 ea fiber fdu panel; 5 ea penetration into building. See outside link.
Posted Date
Dec 11, 2025
Due Date
Feb 12, 2026
Release: Dec 11, 2025
Close: Feb 12, 2026
Work includes specialized horizontal boring installation of approximately 3,128 linear feet of new fiber optic cable and all necessary supporting equipment across five key municipal sites. Traffic control; pot holing; 3128 lf stitch bore, 2" conduit (intterduct ribbed/lubricated); 3128 ft place 48 fiber - city hall to market building - proofing and placement; 2 ea place 48 fiber fdu rack; 3128 ft place #10 locate wire; 20 ea terminate fiber optic cable strand; 5 ea place #6 pull box standard; 7 ea place #6 pull box w/steel lid - traffic rated; 2 ea fiber fdu panel; 5 ea penetration into building. See outside link.
AvailableFurnish, install, and test outside plant fiber optic infrastructure for its broadband infrastructure deployment.
Posted Date
Jan 13, 2026
Due Date
Feb 20, 2026
Release: Jan 13, 2026
Close: Feb 20, 2026
Furnish, install, and test outside plant fiber optic infrastructure for its broadband infrastructure deployment.
AvailableSeeking to procure labor and materials for fiber optic installation services city wide to support our public parks wi-fi expansion.
Posted Date
Nov 12, 2025
Due Date
Jan 26, 2026
Release: Nov 12, 2025
Close: Jan 26, 2026
Seeking to procure labor and materials for fiber optic installation services city wide to support our public parks wi-fi expansion.
Work include fiber optic repair services.
Posted Date
Feb 15, 2022
Due Date
May 5, 2027
Release: Feb 15, 2022
Close: May 5, 2027
Work include fiber optic repair services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis