Open RFP

PCC sidewalk construction along US 45 from IL 142 to the Tunnel Hill State Trail Extention parking lot in Eldorado. RFP

Description: The Illinois Department of Transportation solicitation covers PCC sidewalk construction along US 45 from IL 142 to the Tunnel Hill State Trail Extention parking lot in Eldorado. The project is in Saline County and includes Portland cement concrete sidewalk and driveway pavement, detectable warnings, drainage, curb, pedestrian railing, pavement removal, and traffic-control work. The official page lists the contract as Active with an 08/10/2026 status date and a September 18, 2026 letting at 12:00 PM; it is a construction solicitation rather than a grant, and the plans and special provisions were not available at the time of posting.

Buyer
Released
Aug 10, 2026
Closes
Sep 18, 2026(27 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts