Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
East Mississippi Electric Power Association
Part 1: Water Well, Part 2: Water Distribution Improvements.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Rankin Independent School District
Professional water well repair and testing services and water well drilling services.
Posted Date
Nov 13, 2025
Due Date
Dec 5, 2025
Release: Nov 13, 2025
Rankin Independent School District
Close: Dec 5, 2025
Professional water well repair and testing services and water well drilling services.
AvailableSan Jacinto County
Construct one (1) new water well including drilling, installation of approximately eight hundred fifty vertical feet (850 VF) of casing, column piping, one (1) submersible pump, concrete well head, electrical improvements and controls, related instrumentation, yard piping, driveway and security fencing and all associated appurtenances
Posted Date
Nov 18, 2025
Due Date
Dec 10, 2025
Release: Nov 18, 2025
San Jacinto County
Close: Dec 10, 2025
Construct one (1) new water well including drilling, installation of approximately eight hundred fifty vertical feet (850 VF) of casing, column piping, one (1) submersible pump, concrete well head, electrical improvements and controls, related instrumentation, yard piping, driveway and security fencing and all associated appurtenances
AvailableJasper County
Construction of new 350 GPM Water Well and appurtenances. 1. Furnish and install a new well, including all necessary labor, equipment, tools, materials, piping, fittings, excavation, foundation, pumping equipment, grading, embedment, backfilling, compaction, electrical, teting and all other related waterline valves, fittings, bends, meters, and associated appurtenances; 2. Site improvements including drainage swale, disposal of all construction debris, concrete splash pad for piping drain, silt fencing, final site grading and replacing all damaged San Augustine sod, all in accordance with the plans and specifications; 3. Provide electrical installation including all equipment, grounding, conduits and conductors, connections to equipment and control equipment and all appurtenances, all in accordance with the plans and specifications.
Posted Date
Nov 14, 2025
Due Date
Dec 9, 2025
Release: Nov 14, 2025
Jasper County
Close: Dec 9, 2025
Construction of new 350 GPM Water Well and appurtenances. 1. Furnish and install a new well, including all necessary labor, equipment, tools, materials, piping, fittings, excavation, foundation, pumping equipment, grading, embedment, backfilling, compaction, electrical, teting and all other related waterline valves, fittings, bends, meters, and associated appurtenances; 2. Site improvements including drainage swale, disposal of all construction debris, concrete splash pad for piping drain, silt fencing, final site grading and replacing all damaged San Augustine sod, all in accordance with the plans and specifications; 3. Provide electrical installation including all equipment, grounding, conduits and conductors, connections to equipment and control equipment and all appurtenances, all in accordance with the plans and specifications.
AvailableMoapa Valley Water District
Construction of a culinary water production well to serve as a backup well.
Posted Date
Nov 17, 2025
Due Date
Dec 10, 2025
Release: Nov 17, 2025
Moapa Valley Water District
Close: Dec 10, 2025
Construction of a culinary water production well to serve as a backup well.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis