Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include 1349 CY class 1 excavation; 2311 LF sawcutting; 907 CY foreign borrow excavation; 588 SY plain cement concrete base course, 8" depth; 11627 SY superpave asphalt mixture design, wearing course, pg 64s-22, 0.3 to <3 million esals, 9.5 mm mix, 1 1/2" depth, srl-h; 13847 SY asphalt tack coat; 2023 LF plain cement concrete curb, 6" height, including removal of existing curb, modified city standard; 528 SY cement concrete sidewalk modified (4" depth); 270 SY cement concrete sidewalk modified (6" depth); 200 SF additional traffic control signs; 7531 LF 4" standard pavement markings, paint & beads, yellow.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of pedestrian and traffic signalization, ADA ramps, sidewalks, and striping at Lobdell Ave / Goodwood Blvd and Lobdell Ave / Seven Oaks Ave intersections.
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
Construction of pedestrian and traffic signalization, ADA ramps, sidewalks, and striping at Lobdell Ave / Goodwood Blvd and Lobdell Ave / Seven Oaks Ave intersections.
AvailableThe work includes the construction and installation of a new intersection, roadway realignment of Campus Ave., and stormwater management upgrades. The work includes the demolition of existing sections of Campus Ave., site grading, storm water management devices, road paving, traffic control, and all appurtenances and associated work. See attached file.
Posted Date
Dec 5, 2025
Due Date
Jan 16, 2026
Release: Dec 5, 2025
Close: Jan 16, 2026
The work includes the construction and installation of a new intersection, roadway realignment of Campus Ave., and stormwater management upgrades. The work includes the demolition of existing sections of Campus Ave., site grading, storm water management devices, road paving, traffic control, and all appurtenances and associated work. See attached file.
Temporary Safe-Haven.
Posted Date
Nov 13, 2025
Due Date
Jan 20, 2026
Release: Nov 13, 2025
Close: Jan 20, 2026
Temporary Safe-Haven.
AvailableThe City of Fresno seeks construction services to install a HAWK pedestrian signal at First St & Home Ave and a traffic signal at Chestnut Ave & Weldon Ave, including conduits, pull boxes, conductors, loop detectors, signal poles, controller cabinet, ITS equipment, service pedestal, curb ramps, valley gutter, pavement rehabilitation, signing and striping. The estimated construction allocation is $1,599,650.00 and the work must be completed within 90 working days from the Notice to Proceed. Bidders must hold a valid California Class 'A' or 'C-10' contractor license, provide required bonds (10% bid bond, 100% payment and performance bonds) and comply with federal requirements for federally assisted construction projects.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Release: Dec 15, 2025
Close: Jan 20, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Fresno seeks construction services to install a HAWK pedestrian signal at First St & Home Ave and a traffic signal at Chestnut Ave & Weldon Ave, including conduits, pull boxes, conductors, loop detectors, signal poles, controller cabinet, ITS equipment, service pedestal, curb ramps, valley gutter, pavement rehabilitation, signing and striping. The estimated construction allocation is $1,599,650.00 and the work must be completed within 90 working days from the Notice to Proceed. Bidders must hold a valid California Class 'A' or 'C-10' contractor license, provide required bonds (10% bid bond, 100% payment and performance bonds) and comply with federal requirements for federally assisted construction projects.