Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Scope consists reconstruction of the Town of Mamaroneck Parks Department and Sign Shop Facility located at 26 Maple Street, Larchmont, NY 10538. The existing structure will be demolished to allow for construction of a new 2.5-story structure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of Vermeer sign shop renovation of an existing 70' X 40' metal building to house the City's street signage facility. The work will include a new office space, new restroom / mechanical room, sign print area, and to renovate the existing shop area. Streets and Drainage Facility - this is also an interior renovation in an existing building, and the needs are to expand the existing breakroom and upgrade the conditioned air within the space. There is also an alternate for this location on replacing the existing overhead doors and adding some large industrial fans within the shop area of the facility.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 12, 2026
Project consists of Vermeer sign shop renovation of an existing 70' X 40' metal building to house the City's street signage facility. The work will include a new office space, new restroom / mechanical room, sign print area, and to renovate the existing shop area. Streets and Drainage Facility - this is also an interior renovation in an existing building, and the needs are to expand the existing breakroom and upgrade the conditioned air within the space. There is also an alternate for this location on replacing the existing overhead doors and adding some large industrial fans within the shop area of the facility.
AvailableProvide pro shop reconstruction work includes sewer improvements; pro shop & cart barns construction.
Posted Date
Dec 29, 2025
Due Date
Jan 28, 2026
Release: Dec 29, 2025
Close: Jan 28, 2026
Provide pro shop reconstruction work includes sewer improvements; pro shop & cart barns construction.
AvailableReconstruction of parking lots B and B4 at the Kalihi-Palama Bus Facility.
Posted Date
Dec 1, 2025
Due Date
Jan 30, 2026
Release: Dec 1, 2025
Close: Jan 30, 2026
Reconstruction of parking lots B and B4 at the Kalihi-Palama Bus Facility.
AvailableFurnishing and installing project sign; Installation of erosion and sediment control BMP devices complete; 1,557 SY demolition and removal of AC pavement and base course.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Furnishing and installing project sign; Installation of erosion and sediment control BMP devices complete; 1,557 SY demolition and removal of AC pavement and base course.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →