Wisconsin Department of Administration
State AgencyWI
Jul 31, 2026
Closes
Sep 16, 2026
Parking Lot Construction RFP
In general, the work consists of: pulverizing existing asphalt pavement, removal of existing concrete driveway apron and sidewalks, spot remove and replace curb sections, construction of new parking area to subgrade, base grading, concrete sidewalk, and asphalt paving. Additionally, vehicle and pedestrian access gate removal and replacement with fencing, removal of fence sections, tree removal, outdoor luminaire replacement and restoration. See attached files and outside link.