CityIN
Posted
Oct 28, 2026
Nov 10, 2026
Parking Lot RFP
Work includes parking lot construction.
Description: SCOPE OF WORK Work to be completed under this contract involves the removal of existing asphalt paving, reprofiling the grading of designated areas shown in the drawings, upgrading some drainage infrastructure (curbs, manholes, among others), and installing a new asphalt surface. The replacement must be performed as per the drawings and specifications provided. The contractor must provide all the required materials, equipment before/during/after installation, and labour for installation, and manage the project requirements following the National Building Code of Canada. Project progress meetings are required at regular intervals with the owner, consultant, and the contractor; the specific intervals will be determined in more detail at the kick-off meeting. Further project details are contained in the project plans and specifications. This project shall be completed by March 31, 2027.
StateAgency · QC, CA
Adjacent opportunities open for bidding right now.
CityIN
Posted
Oct 28, 2026
Nov 10, 2026
Work includes parking lot construction.
CountyMO
Posted
Oct 30, 2026
Dec 8, 2026
Proposed work includes: Construction of new asphalt parking lot, curb & gutter, sidewalk, parking lot striping, and landscaping.
Madison District Public Schools
School DistrictMI
Posted
Oct 29, 2026
Nov 19, 2026
MDPS Bus Parking Lot
CityWI
Posted
Oct 28, 2026
Nov 11, 2026
Work includes parking lot chip seal, preparation and related work necessary to complete the improvements to the parking lots.
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Environment and Climate Change Canada.