Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Air Force issued a Sources Sought notice for the PAO Chiller System project to construct an overflow basin and a sound-attenuated mechanical room. The project includes providing and installing materials for chiller support, containment, plumbing, and specific sound transmission class (STC) rated walls and doors. This contract opportunity requires integration with existing equipment and follows a previous request for information to identify capable vendors.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide a pao chiller system.
Posted Date
Sep 18, 2025
Due Date
Feb 9, 2026
Release: Sep 18, 2025
Close: Feb 9, 2026
Provide a pao chiller system.
AvailableProvide and install temporary 500-ton chiller rentals and 2 meg gen-set; install permanent/ temporary chiller lines, tees, and valves.
Posted Date
Dec 23, 2025
Due Date
Feb 3, 2026
Release: Dec 23, 2025
Close: Feb 3, 2026
Provide and install temporary 500-ton chiller rentals and 2 meg gen-set; install permanent/ temporary chiller lines, tees, and valves.
AvailableRemoval and replacement work of the mechanical, electrical, control, and structural systems at the central chiller plant building. Work also includes revision and expansion of the existing DDC control for the new chiller equipment, new refrigerant exhaust fan, new refrigerant gas sensors and updated refrigerant gas monitoring system, hazardous material remediation, electrical power to all new chiller equipment and associated accessories, and providing a third-party commissioning agent to test all newly installed equipment.
Posted Date
Jan 20, 2026
Due Date
Feb 18, 2026
Release: Jan 20, 2026
Close: Feb 18, 2026
Removal and replacement work of the mechanical, electrical, control, and structural systems at the central chiller plant building. Work also includes revision and expansion of the existing DDC control for the new chiller equipment, new refrigerant exhaust fan, new refrigerant gas sensors and updated refrigerant gas monitoring system, hazardous material remediation, electrical power to all new chiller equipment and associated accessories, and providing a third-party commissioning agent to test all newly installed equipment.
Provide PAO Cart Facilities Power Cable, Part Number (P/N) 4106AS0370-2. 1 EA, for Unmanned Air Systems (UAS) Programs in support of the MQ-4C Triton, Royal Australian Air Force (RAAF) Aircrafts.
Posted Date
Jan 27, 2026
Due Date
Feb 23, 2026
Release: Jan 27, 2026
Close: Feb 23, 2026
Provide PAO Cart Facilities Power Cable, Part Number (P/N) 4106AS0370-2. 1 EA, for Unmanned Air Systems (UAS) Programs in support of the MQ-4C Triton, Royal Australian Air Force (RAAF) Aircrafts.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis