Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
Integrated Postsecondary Education Data System identifier.
University or college mascot.
Full-time equivalent employees.
Graduation rate percentage.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If the tech is proprietary or uniquely essential, proceed with a direct sole source justification.
Coops: If a pre-competed vehicle is preferred, use State of Hawaii/NASPO ValuePoint options via the SPO.
Position your product as proprietary or uniquely essential for a department’s research or operational needs to bypass competition. Work with the department to complete and submit the required 'Request For Sole Source' (Form 65), 'Determination of Cost Reasonableness' (Form 95), and 'Notice of Sole Source' (Form 110) to the Office of Procurement Management.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across University of Hawaii at Manoa's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Interim Director of Student Housing Services
Assistant Registrar
Senior Director of Development
Professor of Ocean Engineering
Premium
Access the largest public sector contact database
Active opportunities open for bidding
University of Hawaii at Manoa
Removal of parking lot and roadway light pole assemblies, luminaires, and concrete foundations; providing new parking lot and roadway light pole assemblies, luminaires, and concrete foundations; new exterior luminaires at buildings; underground lighting ductlines and conductors; interior electrical distribution systems including panelboards and branch circuits; and miscellaneous related and incidental work.
Posted Date
Jan 22, 2026
Due Date
Feb 19, 2026
Release: Jan 22, 2026
University of Hawaii at Manoa
Close: Feb 19, 2026
Removal of parking lot and roadway light pole assemblies, luminaires, and concrete foundations; providing new parking lot and roadway light pole assemblies, luminaires, and concrete foundations; new exterior luminaires at buildings; underground lighting ductlines and conductors; interior electrical distribution systems including panelboards and branch circuits; and miscellaneous related and incidental work.
AvailableUniversity of Hawaii at Manoa
Alterations to the existing metal framed Horsebarn, including new metal roofing, flashing, gutters, downspouts, lighting, and power receptacles. The project also includes construction of a new covered Horse Paddock with concrete foundations, structural steel, metal roofing, gutters, and downspouts. Additional work includes construction of a new Office, Restroom, and Storage Room using new shipping containers which will be modified for the intended use, complete with doors and door hardware, windows, thermal insulation, metal panel wall and roof covering, wood truss framing, metal flashing, gutters and downspouts, countertops, toilet accessories, tiling resilient flooring and base, mechanical, plumbing, electrical, and data systems. Site improvements include a new IWS system, parking upgrades with a new ADA-compliant stall, striping and signage, site lighting, and extension of overhead electrical power utilizing new utility poles to be coordinated with the utility company, and miscellaneous paving. Other work includes flatwork, painting, signage, masonry, prefabricated canopy, hazardous material abatement, and miscellaneous related work.
Posted Date
Jan 21, 2026
Due Date
Feb 19, 2026
Release: Jan 21, 2026
University of Hawaii at Manoa
Close: Feb 19, 2026
Alterations to the existing metal framed Horsebarn, including new metal roofing, flashing, gutters, downspouts, lighting, and power receptacles. The project also includes construction of a new covered Horse Paddock with concrete foundations, structural steel, metal roofing, gutters, and downspouts. Additional work includes construction of a new Office, Restroom, and Storage Room using new shipping containers which will be modified for the intended use, complete with doors and door hardware, windows, thermal insulation, metal panel wall and roof covering, wood truss framing, metal flashing, gutters and downspouts, countertops, toilet accessories, tiling resilient flooring and base, mechanical, plumbing, electrical, and data systems. Site improvements include a new IWS system, parking upgrades with a new ADA-compliant stall, striping and signage, site lighting, and extension of overhead electrical power utilizing new utility poles to be coordinated with the utility company, and miscellaneous paving. Other work includes flatwork, painting, signage, masonry, prefabricated canopy, hazardous material abatement, and miscellaneous related work.
AvailableUniversity of Hawaii at Manoa
Removal and replacement work of the mechanical, electrical, control, and structural systems at the central chiller plant building. Work also includes revision and expansion of the existing DDC control for the new chiller equipment, new refrigerant exhaust fan, new refrigerant gas sensors and updated refrigerant gas monitoring system, hazardous material remediation, electrical power to all new chiller equipment and associated accessories, and providing a third-party commissioning agent to test all newly installed equipment.
Posted Date
Jan 20, 2026
Due Date
Feb 18, 2026
Release: Jan 20, 2026
University of Hawaii at Manoa
Close: Feb 18, 2026
Removal and replacement work of the mechanical, electrical, control, and structural systems at the central chiller plant building. Work also includes revision and expansion of the existing DDC control for the new chiller equipment, new refrigerant exhaust fan, new refrigerant gas sensors and updated refrigerant gas monitoring system, hazardous material remediation, electrical power to all new chiller equipment and associated accessories, and providing a third-party commissioning agent to test all newly installed equipment.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.