Southeastern Pennsylvania Transportation Authority
Special DistrictPA
Aug 7, 2026
Closes
Aug 12, 2026
Paint Krylon A03500 Chalk Line Clear (Request for Quotation)
24 EA paint krylon a03500 chalk line clear inverted tip spray paint.
Description: 144 EA Paint Seymour 16-658 Krylon S03410 red/orange fluorescent invertable 12 OZ net spray can water-based VOC compliant lead free (MSC ind. 842540069) (Krylon dept. 7110).
SpecialDistrict · PA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Southeastern Pennsylvania Transportation Authority.
These related opportunities are still open for bidding.
Southeastern Pennsylvania Transportation Authority
Special DistrictPA
Aug 7, 2026
Closes
Aug 12, 2026
24 EA paint krylon a03500 chalk line clear inverted tip spray paint.
Special DistrictCA
Aug 3, 2026
Closes
Aug 28, 2026
Provide paint and body shop supplies.
FederalDC
Jul 30, 2026
Closes
Aug 20, 2026
Work includes, but is not limited to: Removing all loose peeling, bubbling, or delaminated paint to sound substrate and ensuring all surfaces are sound and free of contaminants prior to coating. Cleaning, scraping and sanding all concrete floors walls and ceilings, followed by application of the specified paint system in accordance with manufacturer requirements. Repairing and/or replacing caulk at all joints, seams, and penetrations where cracks, gaps or failed sealant are present. Provide and install Solar Exhaust Fan (reference provided Product Data Sheets or approved equal) per manufacturers specifications. See attached file.
FederalMT
Jul 30, 2026
Closes
Aug 13, 2026
Task one: inspection and preparation of surfaces: conduct a thorough inspection of exterior surfaces, roof rakes, eaves, window trim, vents, door trim, doors, windows, corner trim, deck, deck railing, deck board, stair tread, stair risers, stair stringers, and stair handrails. The contractor shall test identified areas for lead paint and provide test documentation to tpoc. Contractor shall: 1. Identify areas where exterior materials show signs of rot. 2. Identify areas where exterior materials have degraded to the end of their operational life. 3. Identify areas where siding, trim, railings, stairs, or deckboards are no longer fastened properly. 4. Identify areas requiring sanding, perform tests for lead paint on identified areas. Test for lead paint in identified areas. If lead paint is discovered it shall be removed in accordance with applicable federal, state, and local laws. See attached file.