The Orange Beach Waterfront Park Restoration RFP
Work inlcudes build three riprap breakwaters to protect the pocket beach near the wind and water learning center.
Description: Work includes 18,600 SF boardwalk deck board replacement; 1 lsum dune restoration and stormwater ponds ; 2,100 CY excavation and grading.
City · MI, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
Posted
Jul 15, 2026
Sep 19, 2026
Work inlcudes build three riprap breakwaters to protect the pocket beach near the wind and water learning center.
CountyFL
Posted
Aug 4, 2026
Sep 17, 2026
Construction of an Event Hall and Boardwalk that will include the following support facilities: a. Event Hall: 6,523 SF conditioned space and 3,973 SF exterior support space under roof for storage, maintenance workshop and public restrooms. b. Retail Buildings: 4 retail buildings at 851 SF each total. Two of the retail buildings will be divided into 2 separate shops at 420 SF each. c. Public Restrooms: 4,353 SF d. Dune Walk-Over: 6’W x 296’L wood walk-over with shaded areas for viewing and framing for billboard or signage with and 5'W x 147'L of ramp. e. Boardwalk: 15,791 SF all wood deck walkways connecting the various support facilities. See attached file.
CountyFL
Posted
Aug 4, 2026
Sep 17, 2026
Construction of an Event Hall and Boardwalk that will include the following support facilities: a. Event Hall: 6,523 SF conditioned space and 3,973 SF exterior support space under roof for storage, maintenance workshop and public restrooms. b. Retail Buildings: 4 retail buildings at 851 SF each total. Two of the retail buildings will be divided into 2 separate shops at 420 SF each. c. Public Restrooms: 4,353 SF d. Dune Walk-Over: 6’W x 296’L wood walk-over with shaded areas for viewing and framing for billboard or signage with and 5'W x 147'L of ramp. e. Boardwalk: 15,791 SF all wood deck walkways connecting the various support facilities. See attached file.
CityNJ
Posted
Sep 14, 2026
Sep 25, 2026
Reconstruction of the deck, ADA ramps and stair at the existing elevated timber pedestrian walkover at the dead end of Drive.