Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Orangeburg County Broadband is requesting proposals for fiber optic cable for Phase 4 of its Reconnect project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Golden State Connect Authority (GSCA) is soliciting bids to design and construct Phase 1 of the Amador County outside plant (OSP) broadband fiber‑optic network, which includes extensive conduit and fiber installation, handholes, splice closures, and telecommunications huts at multiple locations. The project requires specialized contractor licensing (Class A, or C‑34 + C‑10), compliance with California prevailing wage and bonding/insurance requirements, and provides a construction schedule of 120 calendar days with liquidated damages for delays. Key procurement milestones include a mandatory pre‑bid meeting on 2026‑01‑07, questions due by 2026‑01‑21, answers by 2026‑01‑27, and bids due on 2026‑02‑06 via the buyer’s electronic procurement portal.
Posted Date
Dec 15, 2025
Due Date
Feb 6, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 6, 2026
The Golden State Connect Authority (GSCA) is soliciting bids to design and construct Phase 1 of the Amador County outside plant (OSP) broadband fiber‑optic network, which includes extensive conduit and fiber installation, handholes, splice closures, and telecommunications huts at multiple locations. The project requires specialized contractor licensing (Class A, or C‑34 + C‑10), compliance with California prevailing wage and bonding/insurance requirements, and provides a construction schedule of 120 calendar days with liquidated damages for delays. Key procurement milestones include a mandatory pre‑bid meeting on 2026‑01‑07, questions due by 2026‑01‑21, answers by 2026‑01‑27, and bids due on 2026‑02‑06 via the buyer’s electronic procurement portal.
AvailableWork consist of 209,946 LF of conduit system furnish and installation (mainline directional boring, termination trenching, and bridge crossing), 639 EA of handhole/vaults furnish and installation, 209,946 LF of trace wire furnish and installation, 282,791 LF of fiber optic cable furnish and installation into conduit system, 2,705 SF of surface restoration, hut system installation, 270 EA of splice closures/trays furnish and installation, 39 EA of termination panels and trays installation, 1,674 EA of fiber splices/terminations and testing.
Posted Date
Dec 12, 2025
Due Date
Mar 6, 2026
Release: Dec 12, 2025
Close: Mar 6, 2026
Work consist of 209,946 LF of conduit system furnish and installation (mainline directional boring, termination trenching, and bridge crossing), 639 EA of handhole/vaults furnish and installation, 209,946 LF of trace wire furnish and installation, 282,791 LF of fiber optic cable furnish and installation into conduit system, 2,705 SF of surface restoration, hut system installation, 270 EA of splice closures/trays furnish and installation, 39 EA of termination panels and trays installation, 1,674 EA of fiber splices/terminations and testing.
AvailablePurchase and delivery of fiber optic cable.
Posted Date
Mar 20, 2024
Due Date
Mar 21, 2029
Release: Mar 20, 2024
Close: Mar 21, 2029
Purchase and delivery of fiber optic cable.
AvailableFiber optic cable installation. Perform a conduit installation project involving the installation of 4 conduits measuring 4" in diameter, running underground. The contractor is to provide and install 24 pairs of dark fiber (single mode dark fiber with lc to lc connections) terminations from rack to rack at each building, with splicing services, as required. The proposal should include all necessary services and testing to ensure system integrity, post installation. Please note - The excavation of the roadway and lawn areas (etc) along with removal and replacement of such will be bid separately and is NOT part of this Request for Proposal.
Posted Date
Dec 3, 2025
Due Date
Mar 4, 2026
Release: Dec 3, 2025
Close: Mar 4, 2026
Fiber optic cable installation. Perform a conduit installation project involving the installation of 4 conduits measuring 4" in diameter, running underground. The contractor is to provide and install 24 pairs of dark fiber (single mode dark fiber with lc to lc connections) terminations from rack to rack at each building, with splicing services, as required. The proposal should include all necessary services and testing to ensure system integrity, post installation. Please note - The excavation of the roadway and lawn areas (etc) along with removal and replacement of such will be bid separately and is NOT part of this Request for Proposal.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →