Sewage Treatment Plant Headworks Grant Project - Contract C *REBID*
The project generally consists of replacing the existing system with a new system that is independent from the treatment process piping.
Description: Operations, Maintenance and Management (O&M) contract for the Wastewa- ter Treatment plant and sewage lift stations. The Agreement shall commence with an Initial Partial Operating Term from January 1, 2027, through June 30, 2027, followed by an initial five (5) year operating term from July 1, 2027, through June 30, 2032.
City · TN, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityPA
Posted
Aug 31, 2026
Sep 28, 2026
The project generally consists of replacing the existing system with a new system that is independent from the treatment process piping.
Posted
Aug 26, 2026
Sep 18, 2026
The United States Section of the International Boundary and Water Commission (USIBWC) seeks a contractor for performance-based, full-service operations and maintenance of the South Bay International Wastewater Treatment Plant and associated conveyance assets in San Diego County, California. Work includes daily plant operations, maintenance and repairs, sampling and laboratory testing, monitoring and reporting, asset and fleet management, grounds and housekeeping, chemical supply, and coordination with rehabilitation and expansion activities. This active presolicitation contemplates a firm-fixed-price base year plus four one-year options; it is a federal contract opportunity, not a grant, with responses due September 18, 2026 at 5:00 p.m.
OtherPA
Posted
Aug 6, 2026
Sep 18, 2026
Sewage Treatment Plant Upgrades generally includes installation of the following: an Influent Screening System, an Equalization Tank, Chemical Feed System, two Clarifier Tanks, a Post Aeration Tank, a UV Disinfection System, and all other work details on the Contract Documents.
CountyTX
Posted
-
Oct 15, 2026
This open construction solicitation seeks replacement of the Ellinger Sewer and Water Supply Corporation lift station and a 92,000-gallon-per-day wastewater treatment plant, including related wastewater infrastructure work. The project is funded by the Texas General Land Office under the Community Development Block Grant-Disaster Recovery/Mitigation program, but it is a construction procurement rather than a grant solicitation. Bids are due October 15, 2026, at 12:00 PM, with a non-mandatory pre-bid conference scheduled for September 2, 2026, at 8:00 AM.