Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
International Boundary And Water Commission: U.S.-Mexico
Amistad Reservoir and Dam, Plugging of Penstock No. 4. Requires construction services to permanently plug Penstock No. 4 at Amistad Reservoir and Dam. Penstock No. 4 was designed for irrigation use and has not been operated for irrigation purposes for several decades. The work is intended to eliminate the need for continued maintenance of the Penstock and Irrigation Gates by permanently plugging the penstock and removing related gate components. The work is specialized and involves dam infrastructure, confined access areas, water control features, heavy lifting, unwatering, concrete placement, structural concrete repair, grouting, gate removal, and safety controls. The Government is seeking firms with demonstrated experience performing comparable work in similar high risk construction environments. The anticipated work includes, but is not limited to, the following: Permanent plugging of Penstock No. 4. Unwatering of Penstock No. 4. Construction of concrete plug features within dam infrastructure. Structural concrete repair associated with the penstock and dam features. Removal of penstock and irrigation gate components. Grouting and related concrete repair work. Hoisting, lifting, rigging, crane support, and use of manlift equipment. Work in confined or restricted access areas. Compliance with dam safety, construction safety, and site access requirements. Coordination with USIBWC personnel for access, work hours, security, and site controls.
Posted Date
Jun 8, 2026
Due Date
Jun 18, 2026
Release: Jun 8, 2026
International Boundary And Water Commission: U.S.-Mexico
Close: Jun 18, 2026
Amistad Reservoir and Dam, Plugging of Penstock No. 4. Requires construction services to permanently plug Penstock No. 4 at Amistad Reservoir and Dam. Penstock No. 4 was designed for irrigation use and has not been operated for irrigation purposes for several decades. The work is intended to eliminate the need for continued maintenance of the Penstock and Irrigation Gates by permanently plugging the penstock and removing related gate components. The work is specialized and involves dam infrastructure, confined access areas, water control features, heavy lifting, unwatering, concrete placement, structural concrete repair, grouting, gate removal, and safety controls. The Government is seeking firms with demonstrated experience performing comparable work in similar high risk construction environments. The anticipated work includes, but is not limited to, the following: Permanent plugging of Penstock No. 4. Unwatering of Penstock No. 4. Construction of concrete plug features within dam infrastructure. Structural concrete repair associated with the penstock and dam features. Removal of penstock and irrigation gate components. Grouting and related concrete repair work. Hoisting, lifting, rigging, crane support, and use of manlift equipment. Work in confined or restricted access areas. Compliance with dam safety, construction safety, and site access requirements. Coordination with USIBWC personnel for access, work hours, security, and site controls.
AvailableInternational Boundary And Water Commission: U.S.-Mexico
DESIGN-BUILD: The emergency generator at Retamal Dam is no longer working and rreplacment is necessary. The new generator will be housed in a metal building installed on a new concrete pad with a modern diesel fuel tank. The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, disposal of debris and construction waste, quality control testing.
Posted Date
Jun 2, 2026
Due Date
Jul 21, 2026
Release: Jun 2, 2026
International Boundary And Water Commission: U.S.-Mexico
Close: Jul 21, 2026
DESIGN-BUILD: The emergency generator at Retamal Dam is no longer working and rreplacment is necessary. The new generator will be housed in a metal building installed on a new concrete pad with a modern diesel fuel tank. The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, disposal of debris and construction waste, quality control testing.
AvailableInternational Boundary And Water Commission: U.S.-Mexico
The International Boundary and Water Commission, U.S. Section (IBWC) issued RFQ Solicitation FY263101005 for ongoing security system maintenance, repair, component replacement, and CCURE 9000 software support at Lower Rio Grande Valley facilities. The procurement is a 100% Small Business set-aside to be awarded on a Lowest Price Technically Acceptable basis and requires offers to include technical approach and past performance references. Offers are due June 25, 2026, with mandatory site visits scheduled for early June requiring pre-registration and a non-disclosure agreement.
Posted Date
Jun 1, 2026
Due Date
Jun 25, 2026
Release: Jun 1, 2026
International Boundary And Water Commission: U.S.-Mexico
Close: Jun 25, 2026
The International Boundary and Water Commission, U.S. Section (IBWC) issued RFQ Solicitation FY263101005 for ongoing security system maintenance, repair, component replacement, and CCURE 9000 software support at Lower Rio Grande Valley facilities. The procurement is a 100% Small Business set-aside to be awarded on a Lowest Price Technically Acceptable basis and requires offers to include technical approach and past performance references. Offers are due June 25, 2026, with mandatory site visits scheduled for early June requiring pre-registration and a non-disclosure agreement.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
International Boundary And Water Commission: U.S.-Mexico
---------- COMMENTS: POC: DAVID CASARES, (915) 502-7868 WORK STOPPAGE DIAGNOSTIC AND REPLACEMENT OF FUEL INJECTORS. THE SCRAPER IS DEADLINED. WE HAVE AN URGENT NEED FOR THE SCRAPER TO BE REPAIRED TO USE IN PREPARING THE RIVER FOR THE WATER RELEASE O
Effective Date
Aug 20, 2025
Expires
Effective: Aug 20, 2025
International Boundary And Water Commission: U.S.-Mexico
Expires:
---------- COMMENTS: POC: DAVID CASARES, (915) 502-7868 WORK STOPPAGE DIAGNOSTIC AND REPLACEMENT OF FUEL INJECTORS. THE SCRAPER IS DEADLINED. WE HAVE AN URGENT NEED FOR THE SCRAPER TO BE REPAIRED TO USE IN PREPARING THE RIVER FOR THE WATER RELEASE O
International Boundary And Water Commission: U.S.-Mexico
OPERATION AND MAINTENANCE OF THE SOUTH BAY WASTEWATER TREATMENT PLANT.
Effective Date
Sep 28, 2020
Expires
Effective: Sep 28, 2020
International Boundary And Water Commission: U.S.-Mexico
Expires:
OPERATION AND MAINTENANCE OF THE SOUTH BAY WASTEWATER TREATMENT PLANT.
International Boundary And Water Commission: U.S.-Mexico
OCEAN OUTFALL SAMPLING AND MONITORING
Effective Date
Oct 1, 2023
Expires
Effective: Oct 1, 2023
International Boundary And Water Commission: U.S.-Mexico
Expires:
OCEAN OUTFALL SAMPLING AND MONITORING
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge