Provide on-call Mechanical, Electrical, Plumbing, and Fire Protection (MEP/FP) engineering services for City-owned facilities. These services will support both new construction and major renovations, with the goal of ensuring safe, reliable, code-compliant, and well-coordinated building systems. Scope of work may include assessment and evaluation of existing MEP/FP systems; preparation of design documents; interdisciplinary coordination; construction phase services such as site visits, submittal and RFI reviews, and field observations; and project close-out and warranty follow-up services.
Provide design-build (db), collaborative (progressive) design-build (cdb), and construction manager at risk (cmar) services the design, preconstruction, construction management, and/or construction of a portfolio of fire alarm projects.
KCKun ChenAcademic Director of UConn’s M.S. in Data Science Program
*******@************
RFP documents & timeline
From the first pre-RFP signals to the published RFP and its files.
2 files available
Agenda packet
28 days before RFP
The agenda recorded Gampel Pavilion Phase 3 in planning and design for substantial HVAC upgrades anticipated to begin construction in Fall 2028.
See sourceHide source
During design development, it was determined that the facility's 39-year-old HVAC system requires substantial upgrades beyond the original project scope and budget. These improvements are critical to addressing condensation issues during events and preventing water accumulation and dripping onto the playing surface. Phase 3, currently in planning and…
The capital expenditure report recorded the $1.4 million MAA Foam Fire Suppression System Replacement project in Planning/Design.
See sourceHide source
University of Connecticut Capital Project Expenditure Report - All Funding Sources Fiscal Year 2026 as of 6/30/2026 Fiscal Year to Date Expenditures By Funding Source Project Name Hybrid Operating Room 2 Fit-out 6,749,664 5,539,496 Substantially Complete 5,351,096 5,351,096 Interventional Radiology Equipment Replacement & Renovation 8,700,000 556,244…
University of Connecticut Board of Trustees Agenda
The status report recorded the $1,000,000 COGEN Emergency Generators project in the design-budget phase.
See sourceHide source
CONSTRUCTION PROJECTS STATUS REPORT BOARD OF TRUSTEES MEETING -September 23, 2026 Project Name by Construction Phase Project # Budget Phase Budgeted Funding Source(s) BOT Budget Approval Date(s) Estimated Completion Date Estimated Construction % Complete Planning Budget Phase Energy Services Performance Contract FO502072 $500,000 $25,000 P University Funds…