Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1. Provide and maintain temporary chain link construction fencing to secure work areas. 2. Installation of specified private sewer system and connection to public sewer system. 3. Flush existing restroom system prior to public sewer connection, perform final flush and inspection after completion of the private sewer system installation, and verify operation of restroom. 4. Purchase and installation of specified pump grinder system and connection to existing restroom. 5. Purchase and installation of drinking fountain. 6. Installation of concrete paving and curbing. 7. Restoration of asphalt concrete paving disturbed by construction. 8. Electrical modifications and installation of new musco lighting control cabinet. 9. Boring musco pole light footers. 10. Installation of conduit, wire and final connections and operation of new musco sports court lights (note: district to procure musco equipment. Contractor responsible for coordination with district and musco). 11. Backfill, grade, and feather areas adjacent to work. Grade disturbed areas to drain per contract documents and in consultation with the district landscape architect. 12. Clean up work area and remove all trash and debris from project area. 13. Contractor to construct the project per the attached plans and technical specifications. 14. District to contract with inspection agency for the project for geotechnical and special inspections.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide Downtown Septic to Sewer Connections Project .
Posted Date
Dec 14, 2025
Due Date
Jan 20, 2026
Release: Dec 14, 2025
Close: Jan 20, 2026
Provide Downtown Septic to Sewer Connections Project .
AvailableUnity Park Playground Improvements Project.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Unity Park Playground Improvements Project.
AvailableProcurement for sewer system improvements at the Kualoa Regional Park Maintenance Facility.
Posted Date
Aug 1, 2025
Due Date
Jan 24, 2026
Release: Aug 1, 2025
Close: Jan 24, 2026
Procurement for sewer system improvements at the Kualoa Regional Park Maintenance Facility.
AvailableThe City of Alpharetta requests proposals to upgrade lighting at multiple fields and courts within North Park at 13450 Cogburn Road. The scope includes removing existing wooden poles, installing new concrete poles, upgrading fixtures to LED to meet at least Class IV lighting levels, and providing required design and permitting. The project is funded in part by Land & Water Conservation Fund (LWCF) grant funds and requires compliance with associated requirements, bonding, insurance, and licensing.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
The City of Alpharetta requests proposals to upgrade lighting at multiple fields and courts within North Park at 13450 Cogburn Road. The scope includes removing existing wooden poles, installing new concrete poles, upgrading fixtures to LED to meet at least Class IV lighting levels, and providing required design and permitting. The project is funded in part by Land & Water Conservation Fund (LWCF) grant funds and requires compliance with associated requirements, bonding, insurance, and licensing.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis