Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking a professional engineering firm to provide the City with phase I and phase II design engineering services for the installation of a new ADA compliant sidewalk and crosswalks. Services will also include a topographic survey, completing an application and submitting the project for a Safe Routes to School Grant, preparing easement documents (if needed), and bid preparation. Additional services and details are listed in the RFP. Each design phase of the project will require reviews and approvals by IDOT. Additionally, the selected firm will be expected to collaborate with City staff (which may include, but is not limited to, the Public Works Department, Engineering Department, and the Community Development Department), school district staff, HOA members, and City Council Alderpersons. See the outside links for more details.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Polk County is soliciting proposals from qualified firms to provide construction engineering and inspection (CEI) services for the Combee Academy Safe Routes to School (SRTS) Sidewalk and Street Lighting project. The selected consultant will administer the construction contract and provide inspection and related oversight to ensure conformance with project requirements. Proposals are due on January 28, 2026.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Polk County is soliciting proposals from qualified firms to provide construction engineering and inspection (CEI) services for the Combee Academy Safe Routes to School (SRTS) Sidewalk and Street Lighting project. The selected consultant will administer the construction contract and provide inspection and related oversight to ensure conformance with project requirements. Proposals are due on January 28, 2026.
AvailableThe project includes the construction of approx. 1,061 feet of sidewalk and the re-construction of numerous driveways. Five-foot wide sidewalk will be constructed on: Morgan Combee Road from Combee Road to Woodland Avenue and Morganwood Drive to Ridge Lake Court (south and north side, respectively). Street lighting will be designed and installed by Lakeland Electric (LE). Existing utilities will be relocated and/or modified as needed. This project will meet FDOT Standards.
Posted Date
Dec 16, 2025
Due Date
Jan 28, 2026
Release: Dec 16, 2025
Close: Jan 28, 2026
The project includes the construction of approx. 1,061 feet of sidewalk and the re-construction of numerous driveways. Five-foot wide sidewalk will be constructed on: Morgan Combee Road from Combee Road to Woodland Avenue and Morganwood Drive to Ridge Lake Court (south and north side, respectively). Street lighting will be designed and installed by Lakeland Electric (LE). Existing utilities will be relocated and/or modified as needed. This project will meet FDOT Standards.
Sidewalk project.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Sidewalk project.
AvailableThis Safe Routes to School project will add sidewalk, pedestrian ramps and minor roadway work. This project will include minor storm sewer improvements, signal upgrades and roadway markings.
Posted Date
Jan 16, 2026
Due Date
Feb 10, 2026
Release: Jan 16, 2026
Close: Feb 10, 2026
This Safe Routes to School project will add sidewalk, pedestrian ramps and minor roadway work. This project will include minor storm sewer improvements, signal upgrades and roadway markings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis