Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 300 LF silt fence; 1 LS pump station; 35 LF 12" C900 gravity sewer; 40 LF 1-" C900 bell and spigot force main;
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of Sewer and Drain Pump Station Wet Well Cleaning.
Posted Date
Jan 22, 2026
Due Date
Feb 5, 2026
Release: Jan 22, 2026
Close: Feb 5, 2026
Work consists of Sewer and Drain Pump Station Wet Well Cleaning.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the construction of the Jordan Road Phase 3 Force Main and Sewer Pump Station.
Posted Date
-
Due Date
Feb 6, 2026
Close: Feb 6, 2026
Procurement for the construction of the Jordan Road Phase 3 Force Main and Sewer Pump Station.
AvailableWork includes complete demolition of existing sewer lift station, construct new sewer lift station - complete, electrical work, concrete and masonry work.
Posted Date
Jan 28, 2026
Due Date
Feb 19, 2026
Release: Jan 28, 2026
Close: Feb 19, 2026
Work includes complete demolition of existing sewer lift station, construct new sewer lift station - complete, electrical work, concrete and masonry work.
AvailableThe project consists of handling of existing wastewater flows and bypass pumping, manhole-to-manhole replacement of existing sewer main and services, installation of sewage grinder manhole, replacement of existing wet well, installation of valve vault structure, removal of existing single-phase duplex submersible pumps and associated hardware, furnishing and installation of new sewage grinder unit, furnishing and installation of new three-phase duplex submersible cutter pumps and associated hardware, installation of new submersible level transducer and digital controller with emergency back-up high level alarm float, installation of Mission alarm notification system, removal and replacement of existing control panel with a new control panel, installation of VFD to convert single-phase input power to three-phase, installation of new underground electrical conduits, removal and proper disposal of existing fence and installation of new fence, removal and proper disposal of existing liquid propane generator and fuel storage tank, installation of a new liquid propane generator and fuel storage tank, installation of new water service and yard hydrant, paving of pump station site and driveway, environmental controls, loaming and seeding, landscaping, dewatering as necessary, and all other items required to provide a completed operational sewer pump station as shown and specified in the Birch Road Sewer Pump Station Improvements contract documents, including all labor, material and equipment necessary to complete the Work.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
The project consists of handling of existing wastewater flows and bypass pumping, manhole-to-manhole replacement of existing sewer main and services, installation of sewage grinder manhole, replacement of existing wet well, installation of valve vault structure, removal of existing single-phase duplex submersible pumps and associated hardware, furnishing and installation of new sewage grinder unit, furnishing and installation of new three-phase duplex submersible cutter pumps and associated hardware, installation of new submersible level transducer and digital controller with emergency back-up high level alarm float, installation of Mission alarm notification system, removal and replacement of existing control panel with a new control panel, installation of VFD to convert single-phase input power to three-phase, installation of new underground electrical conduits, removal and proper disposal of existing fence and installation of new fence, removal and proper disposal of existing liquid propane generator and fuel storage tank, installation of a new liquid propane generator and fuel storage tank, installation of new water service and yard hydrant, paving of pump station site and driveway, environmental controls, loaming and seeding, landscaping, dewatering as necessary, and all other items required to provide a completed operational sewer pump station as shown and specified in the Birch Road Sewer Pump Station Improvements contract documents, including all labor, material and equipment necessary to complete the Work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →