Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Old Highway 12 Phase 2 Reconstruction Project is a road improvement contract issued by the Bowman County Commission in North Dakota. The scope includes grading, surfacing, culvert replacements, and other reconstruction tasks. Bids are due by January 19, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the full reconstruction of 25th Street, Phase II, including roadway milling, demolition, curb, sidewalk, ADA curb ramps, driveway approaches, site restoration, and mobilization.
Posted Date
Jan 2, 2026
Due Date
Jan 29, 2026
Release: Jan 2, 2026
Close: Jan 29, 2026
This RFP is for the full reconstruction of 25th Street, Phase II, including roadway milling, demolition, curb, sidewalk, ADA curb ramps, driveway approaches, site restoration, and mobilization.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Sioux City is soliciting sealed bids for the South Apron Reconstruction Phase 2 Project at Sioux Gateway Airport, 2403 Aviation Boulevard. The work includes removing approximately 2,330 square yards of existing composite pavement, preparing and treating 2,200 square yards of subgrade, installing 2,200 square yards of new 12‑inch PCC pavement, placing about 50 tons of asphalt tie‑ins, and replacing nine stormwater structures. Bids are due January 13, 2026 at 1:00 PM local time, with a pre‑bid meeting on January 6, 2026 at 10:00 AM.
Posted Date
Dec 23, 2025
Due Date
Jan 13, 2026
Release: Dec 23, 2025
Close: Jan 13, 2026
The City of Sioux City is soliciting sealed bids for the South Apron Reconstruction Phase 2 Project at Sioux Gateway Airport, 2403 Aviation Boulevard. The work includes removing approximately 2,330 square yards of existing composite pavement, preparing and treating 2,200 square yards of subgrade, installing 2,200 square yards of new 12‑inch PCC pavement, placing about 50 tons of asphalt tie‑ins, and replacing nine stormwater structures. Bids are due January 13, 2026 at 1:00 PM local time, with a pre‑bid meeting on January 6, 2026 at 10:00 AM.
AvailableResidential reconstruction. Work includes clearing and grubbing; tree removal; 132 LF of 12" and under pipe abandoned; 3,521 CY of excavation; 1,239 CY of asphalt concrete base; 2,856 CY of aggregate base; 11,607 LF of 6" shallow pipe underdrain; 29,159 SF of 4" concrete walk; 7 Ea No.3 manhole; 8 LF of 8" ductile iron pipe; 16 EA standard hydrant assembly; 66 EA 1" service connections; 6 EA 1" directional bore for water main; 13 EA sanitary lateral videotaping. See outside link.
Posted Date
Dec 19, 2025
Due Date
Jan 6, 2026
Release: Dec 19, 2025
Close: Jan 6, 2026
Residential reconstruction. Work includes clearing and grubbing; tree removal; 132 LF of 12" and under pipe abandoned; 3,521 CY of excavation; 1,239 CY of asphalt concrete base; 2,856 CY of aggregate base; 11,607 LF of 6" shallow pipe underdrain; 29,159 SF of 4" concrete walk; 7 Ea No.3 manhole; 8 LF of 8" ductile iron pipe; 16 EA standard hydrant assembly; 66 EA 1" service connections; 6 EA 1" directional bore for water main; 13 EA sanitary lateral videotaping. See outside link.
Work includes pavement reconstruction work, including drainage improvements.
Posted Date
Jan 2, 2026
Due Date
Feb 3, 2026
Release: Jan 2, 2026
Close: Feb 3, 2026
Work includes pavement reconstruction work, including drainage improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →