Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of 460 SY demolition of pavement, 550 LF curb & gutter, 1,670 SY concrete sidewalk, 370 SY entrance gutter, 270 LF pavement marking, 500 CY regular excavation, 1 LS erosion and sediment control, 20 EA adjust valve box, 49 LF 15" concrete pipe. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Hampton ITB for construction of pedestrian improvements on Old Buckroe Road: installation of hydraulic cement sidewalk (~1,670 SY), ADA curb ramps (14 EA), curb & gutter (~550 LF), driveway replacement, storm pipe work and associated traffic control and erosion control. Federally funded VDOT/ TAP project requiring VDOT prequalification and Virginia contractor registration; DBE goal 0%. Contract terms: 180 calendar days, 100% performance and payment bonds, 5% bid security, sealed hard-copy submission required, contractor license to be provided upon Notice of Intent to Award.
Posted Date
Nov 25, 2025
Due Date
Dec 30, 2025
Release: Nov 25, 2025
Close: Dec 30, 2025
Premium
Access the largest public sector contact database
City of Hampton ITB for construction of pedestrian improvements on Old Buckroe Road: installation of hydraulic cement sidewalk (~1,670 SY), ADA curb ramps (14 EA), curb & gutter (~550 LF), driveway replacement, storm pipe work and associated traffic control and erosion control. Federally funded VDOT/ TAP project requiring VDOT prequalification and Virginia contractor registration; DBE goal 0%. Contract terms: 180 calendar days, 100% performance and payment bonds, 5% bid security, sealed hard-copy submission required, contractor license to be provided upon Notice of Intent to Award.
AvailablePedestrian bridge repairs.
Posted Date
Oct 14, 2025
Due Date
Dec 12, 2025
Release: Oct 14, 2025
Close: Dec 12, 2025
Pedestrian bridge repairs.
Work consists of pedestrian safety improvements, along with pedestrian and bicycle improvements, the project includes pavement rehabilitation and reconstruction treatments to improve safety for pedestrians at residential driveways and cross streets, and sidewalk infrastructure to establish compliance with the Americans with disabilities act. The project also includes minor modifications to storm drainage facilities
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
Work consists of pedestrian safety improvements, along with pedestrian and bicycle improvements, the project includes pavement rehabilitation and reconstruction treatments to improve safety for pedestrians at residential driveways and cross streets, and sidewalk infrastructure to establish compliance with the Americans with disabilities act. The project also includes minor modifications to storm drainage facilities
Available13 LF Plain Cement Concrete Curb, 6" Height, Including Removal of Existing Curb and Pavement Restoration; 37 LF Plain Cement Concrete Curb, 8" Height, Including Removal of Existing Curb and Pavement Restoration; 69 LF Plain Concrete Mountable Curb, Type A, Including Pavement Restoration; 84 SY Cement Concrete Sidewalk, Including Excavation and Roadside Development; 62 SF Detectable Warning Surface, Polymer Composite; 78 LF AWG 8 Underground Cable, Copper, 1 Conductor; 52 SF Post Mounted Signs, Type B; 20 SF Post Mounted Signs, Type F; 30 SF Structure Mounted Flat Aluminum Signs; 2 ea Rectangular Rapid Flashing Beacon Assembly (Single Sided); 2 ea Rectangular Rapid Flashing Beacon Assembly (Double Sided); 6 ea Flexible Delineator Post, Surface Mount Type SM-1, Yellow Post with Yellow Sheeting; 23 LF of 2" Conduit, PVC; 102 LF of 3" Conduit, PVC; 43 LF Trench and Backfill, Type I; 19 LF Trench and Backfill, Type II; 43 LF Trench and Backfill, Type III; 228 LF Signal Cable, 14 AWG, 3 Conductor; 8 LF of 4" White Hot Thermoplastic Pavement Markings; 186 LF of 4" Yellow Hot Thermoplastic Pavement Markings; 233 LF of 24" White Hot Thermoplastic Pavement Markings; 43 LF of 24" Yellow Hot Thermoplastic Pavement Markings. See attached file.
Posted Date
Dec 1, 2025
Due Date
Jan 19, 2026
Release: Dec 1, 2025
Close: Jan 19, 2026
13 LF Plain Cement Concrete Curb, 6" Height, Including Removal of Existing Curb and Pavement Restoration; 37 LF Plain Cement Concrete Curb, 8" Height, Including Removal of Existing Curb and Pavement Restoration; 69 LF Plain Concrete Mountable Curb, Type A, Including Pavement Restoration; 84 SY Cement Concrete Sidewalk, Including Excavation and Roadside Development; 62 SF Detectable Warning Surface, Polymer Composite; 78 LF AWG 8 Underground Cable, Copper, 1 Conductor; 52 SF Post Mounted Signs, Type B; 20 SF Post Mounted Signs, Type F; 30 SF Structure Mounted Flat Aluminum Signs; 2 ea Rectangular Rapid Flashing Beacon Assembly (Single Sided); 2 ea Rectangular Rapid Flashing Beacon Assembly (Double Sided); 6 ea Flexible Delineator Post, Surface Mount Type SM-1, Yellow Post with Yellow Sheeting; 23 LF of 2" Conduit, PVC; 102 LF of 3" Conduit, PVC; 43 LF Trench and Backfill, Type I; 19 LF Trench and Backfill, Type II; 43 LF Trench and Backfill, Type III; 228 LF Signal Cable, 14 AWG, 3 Conductor; 8 LF of 4" White Hot Thermoplastic Pavement Markings; 186 LF of 4" Yellow Hot Thermoplastic Pavement Markings; 233 LF of 24" White Hot Thermoplastic Pavement Markings; 43 LF of 24" Yellow Hot Thermoplastic Pavement Markings. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis