Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Northampton Township
772 LF Saw Cutting; 100 CY Class 2 Excavation; 10 CY Foreign Borrow Excavation; 89 SY SAMD, Base Course, PG 64S-22, 0.3 To <3 Million Esals, 25MM Mix, 6" Depth; 232 SY SAMD, Base Course, PG 64S-22, 3 To <10 Million Esals, 25MM Mix, 6" Depth; 321 SY Subbase 6" Depth (No. 2A); 89 SY SAMD, Wearing Course, PG 64S-22, 0.3 To <3 Million Esals, 9.5MM Mix, 1-1/2" Depth, SRL-L; 679 SY SAMD, Wearing Course, PG 64S-22, 3 To <10 Million Esals, 9.5MM Mix, 1-1/2" Depth, SRL-H; 89 SY SAMD, Binder Course, PG 64S-22, 0.3 To <3 Million Esals, 19MM Mix, 2-1/2" Depth; 232 SY SAMD, Binder Course, PG 64S-22, 3 To <10 Million Esals, 19MM Mix, 2-1/2" Depth; 447 SY Milling of Asphalt Pavement Surface, 1 1/2" Depth, Milled Material Retained By Contractor; 1,089 SY Asphalt Tack Coat; 198 LF of 18" Reinforced Concrete Pipe, Type A, (Open Joint), 7'-3' Fill, Shore/Trench Box, 100 Year Design Life; 176 LF Plain Cement Concrete Curb, 6"; 511 LF Plain Cement Concrete Curb, 8" Height, Including Removal of Existing Curb; 931 SY Cement Concrete Sidewalk, Including Excavation; 66 SY Sidewalks and Driveway Aprons Through Driveways; 154 SF Detectable Warning Surface, Polymer Composite; 70 LB Seeding and Soil Supplements - Formula B Residential Mix, Including Mulch; 320 LF of 4" White Hot Thermoplastic Pavement Markings; 674 LF of 6" White Hot Thermoplastic Pavement Markings; 575 SY Richboro 2000 Sidewalk, Including Excavation; 1,083 SF Modular Block Retaining Wall (Segmented Blocks, Caps and End Units). See attached file.
Posted Date
Feb 4, 2026
Due Date
Mar 9, 2026
Release: Feb 4, 2026
Northampton Township
Close: Mar 9, 2026
772 LF Saw Cutting; 100 CY Class 2 Excavation; 10 CY Foreign Borrow Excavation; 89 SY SAMD, Base Course, PG 64S-22, 0.3 To <3 Million Esals, 25MM Mix, 6" Depth; 232 SY SAMD, Base Course, PG 64S-22, 3 To <10 Million Esals, 25MM Mix, 6" Depth; 321 SY Subbase 6" Depth (No. 2A); 89 SY SAMD, Wearing Course, PG 64S-22, 0.3 To <3 Million Esals, 9.5MM Mix, 1-1/2" Depth, SRL-L; 679 SY SAMD, Wearing Course, PG 64S-22, 3 To <10 Million Esals, 9.5MM Mix, 1-1/2" Depth, SRL-H; 89 SY SAMD, Binder Course, PG 64S-22, 0.3 To <3 Million Esals, 19MM Mix, 2-1/2" Depth; 232 SY SAMD, Binder Course, PG 64S-22, 3 To <10 Million Esals, 19MM Mix, 2-1/2" Depth; 447 SY Milling of Asphalt Pavement Surface, 1 1/2" Depth, Milled Material Retained By Contractor; 1,089 SY Asphalt Tack Coat; 198 LF of 18" Reinforced Concrete Pipe, Type A, (Open Joint), 7'-3' Fill, Shore/Trench Box, 100 Year Design Life; 176 LF Plain Cement Concrete Curb, 6"; 511 LF Plain Cement Concrete Curb, 8" Height, Including Removal of Existing Curb; 931 SY Cement Concrete Sidewalk, Including Excavation; 66 SY Sidewalks and Driveway Aprons Through Driveways; 154 SF Detectable Warning Surface, Polymer Composite; 70 LB Seeding and Soil Supplements - Formula B Residential Mix, Including Mulch; 320 LF of 4" White Hot Thermoplastic Pavement Markings; 674 LF of 6" White Hot Thermoplastic Pavement Markings; 575 SY Richboro 2000 Sidewalk, Including Excavation; 1,083 SF Modular Block Retaining Wall (Segmented Blocks, Caps and End Units). See attached file.
Northampton Township
Work include installation of 8" water main, water main taps, curb stops, residential connections to public water, interior plumbing work, and services with meters and all appurtenances.
Posted Date
Jan 18, 2026
Due Date
Feb 18, 2026
Release: Jan 18, 2026
Northampton Township
Close: Feb 18, 2026
Work include installation of 8" water main, water main taps, curb stops, residential connections to public water, interior plumbing work, and services with meters and all appurtenances.
Northampton Township
13 LF Plain Cement Concrete Curb, 6" Height, Including Removal of Existing Curb and Pavement Restoration; 37 LF Plain Cement Concrete Curb, 8" Height, Including Removal of Existing Curb and Pavement Restoration; 69 LF Plain Concrete Mountable Curb, Type A, Including Pavement Restoration; 84 SY Cement Concrete Sidewalk, Including Excavation and Roadside Development; 62 SF Detectable Warning Surface, Polymer Composite; 78 LF AWG 8 Underground Cable, Copper, 1 Conductor; 52 SF Post Mounted Signs, Type B; 20 SF Post Mounted Signs, Type F; 30 SF Structure Mounted Flat Aluminum Signs; 2 ea Rectangular Rapid Flashing Beacon Assembly (Single Sided); 2 ea Rectangular Rapid Flashing Beacon Assembly (Double Sided); 6 ea Flexible Delineator Post, Surface Mount Type SM-1, Yellow Post with Yellow Sheeting; 23 LF of 2" Conduit, PVC; 102 LF of 3" Conduit, PVC; 43 LF Trench and Backfill, Type I; 19 LF Trench and Backfill, Type II; 43 LF Trench and Backfill, Type III; 228 LF Signal Cable, 14 AWG, 3 Conductor; 8 LF of 4" White Hot Thermoplastic Pavement Markings; 186 LF of 4" Yellow Hot Thermoplastic Pavement Markings; 233 LF of 24" White Hot Thermoplastic Pavement Markings; 43 LF of 24" Yellow Hot Thermoplastic Pavement Markings. See attached file.
Posted Date
Dec 1, 2025
Due Date
Jan 19, 2026
Release: Dec 1, 2025
Northampton Township
Close: Jan 19, 2026
13 LF Plain Cement Concrete Curb, 6" Height, Including Removal of Existing Curb and Pavement Restoration; 37 LF Plain Cement Concrete Curb, 8" Height, Including Removal of Existing Curb and Pavement Restoration; 69 LF Plain Concrete Mountable Curb, Type A, Including Pavement Restoration; 84 SY Cement Concrete Sidewalk, Including Excavation and Roadside Development; 62 SF Detectable Warning Surface, Polymer Composite; 78 LF AWG 8 Underground Cable, Copper, 1 Conductor; 52 SF Post Mounted Signs, Type B; 20 SF Post Mounted Signs, Type F; 30 SF Structure Mounted Flat Aluminum Signs; 2 ea Rectangular Rapid Flashing Beacon Assembly (Single Sided); 2 ea Rectangular Rapid Flashing Beacon Assembly (Double Sided); 6 ea Flexible Delineator Post, Surface Mount Type SM-1, Yellow Post with Yellow Sheeting; 23 LF of 2" Conduit, PVC; 102 LF of 3" Conduit, PVC; 43 LF Trench and Backfill, Type I; 19 LF Trench and Backfill, Type II; 43 LF Trench and Backfill, Type III; 228 LF Signal Cable, 14 AWG, 3 Conductor; 8 LF of 4" White Hot Thermoplastic Pavement Markings; 186 LF of 4" Yellow Hot Thermoplastic Pavement Markings; 233 LF of 24" White Hot Thermoplastic Pavement Markings; 43 LF of 24" Yellow Hot Thermoplastic Pavement Markings. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $23,800, sole source is still not favored and rarely (if ever) used—only attempt with extraordinary, well-documented justification; otherwise default to competing.
Coops: If your offering is on a cooperative contract they can use, lead with that to bypass a formal bid.
Entity: Northampton Township, PA
Practice: No evidence of sole source awards; the Township adheres to competitive processes.
Board meetings and strategic plans from Northampton Township
The meeting commenced with public comment concerning long-term debt funding for non-essential items such as the country club purchase and questions regarding funding for new agenda items. The consent agenda, which included approvals for minutes and accounts payable for February 11 and February 25, 2026, was approved, along with a resolution establishing a snow emergency from January 24 to 26, 2026. New business involved authorizing the advertisement of an ordinance setting uniform wastewater requirements for properties flowing to the Warminster Township Municipal Authority to comply with the Clean Water Act. A public hearing was held and closed regarding an ordinance establishing a multi-way stop intersection at Highland Drive and Farmway Drive, based on resident concerns and a traffic study. Another hearing resulted in the adoption of an ordinance updating building codes to include the 2021 International Fire Code. A resolution was adopted to authorize an agreement with PennDOT for sidewalk maintenance responsibility transfer for the Buck Road streetscape project, with maintenance ultimately falling to adjacent property owners. Liaison reports included praise for the Public Works department's snow response efforts utilizing both in-house and contracted resources, updates on senior center activities and upcoming events, registration details for Parks and Recreation camp, and updates on local development projects including Russell Gardens and construction on Buck Road. The board also noted the School Board's approval for an engineering study for a new stadium at Council Rock South.
This document outlines the Roadway Maintenance Program, presenting historical data on miles paved and associated costs from 2005 to 2026. It details the 2026 Paving Program, itemizing specific streets, roadway lengths, and estimated costs for various paving methods including milling and overlay, nova chip, and surface treatment projects. The program focuses on the management and improvement of road infrastructure.
The meeting began with an agenda review session followed by the regular business meeting where officials, including two supervisors, took the Oath of Office. Key organizational actions included the election of the Board Chairman, Vice-Chairman, Secretary, and Treasurer for 2026, and the appointment of an Assistant Secretary. The Board adopted several resolutions setting financial parameters, including Resolution R-26-1 fixing bond limits and Resolution R-26-2 establishing the 2026 real estate tax millage rate totaling 35.25 mils. The 2026 Board of Supervisors meeting schedule was set, along with the 2026 holiday schedule and mileage reimbursement rate. Financial institutions were designated as official depositories, and insurance providers were reaffirmed. Resolution R-26-3 adopting the revised 2026 fee schedule and Resolution R-26-4 reaffirming Emergency Operations Plans were approved. Professional appointments included naming Pizzo Rudolph LLC as Solicitor, Gilmore & Associates and McMahon Associates as Engineers, and Offit/Kurman Attorneys as Labor Attorney. Numerous appointments and reappointments were made to various Boards and Commissions, such as the Blighted Property Review Committee, Library Board, and Planning Commission. During the public comment period, residents raised concerns regarding meeting structure, operating budget funding, and the single-provider refuse collection system.
Key discussions included a debriefing on the Wreath Laying event, which was deemed successful. Discussions regarding flags at RJD Park and Flags for Forgotten Soldiers were tabled pending the liaison's return. The commission distributed Veterans Day certificates and established plans for follow-up on a completed video. New leadership roles were established with the election of the Chair, Vice Chair, and Secretary. The commission discussed enhancing existing programs for the 250th Birthday celebration, including the possibility of including a cake. Approval was granted to cover the annual cost of the Evite subscription used for the Wreath Laying fundraiser. Future planning included hosting a Veterans Expo for the 250th Birthday, with research into grant application requirements assigned. Dates for scheduled 2026 events were confirmed.
The meeting commenced with a moment of silence for victims of a tragic homicide. Key discussions focused on the Russell Gardens subdivision project, a 14.5-acre development on New Road zoned R2, involving the preliminary final plan approval subject to specific conditions, including stormwater management agreements, fees in lieu of park and recreation space ($133,433 total for 18 lots), sidewalk construction, and tree replacement fees ($73,200). Public comment raised concerns regarding lot sizes, traffic implications, and potential headlight glare, which the engineering firm addressed by confirming compliance with access requirements and projecting a traffic reduction compared to the previous commercial use. Additionally, the board addressed a resident complaint regarding intersection safety by moving to advertise an ordinance amendment to establish a multi-way stop intersection at Farmway Drive and Highland Drive, based on a traffic study that met two of the five warrant criteria for an all-way stop.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Northampton Township's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database