Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Carson City
Work consists of pedestrian safety improvements, along with pedestrian and bicycle improvements, the project includes pavement rehabilitation and reconstruction treatments to improve safety for pedestrians at residential driveways and cross streets, and sidewalk infrastructure to establish compliance with the Americans with disabilities act. The project also includes minor modifications to storm drainage facilities
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of West Hollywood
The City of West Hollywood seeks bids for the La Brea Avenue Pedestrian Lighting Improvement Project, involving replacement and installation of pedestrian light fixtures, conduits, and wiring.
Posted Date
Nov 13, 2025
Due Date
Dec 11, 2025
Release: Nov 13, 2025
City of West Hollywood
Close: Dec 11, 2025
The City of West Hollywood seeks bids for the La Brea Avenue Pedestrian Lighting Improvement Project, involving replacement and installation of pedestrian light fixtures, conduits, and wiring.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of West Hollywood
The City of West Hollywood seeks bids for the La Brea Avenue Pedestrian Lighting Improvement Project, involving replacement and installation of pedestrian light fixtures, conduits, and wiring.
Posted Date
Nov 13, 2025
Due Date
Dec 11, 2025
Release: Nov 13, 2025
City of West Hollywood
Close: Dec 11, 2025
The City of West Hollywood seeks bids for the La Brea Avenue Pedestrian Lighting Improvement Project, involving replacement and installation of pedestrian light fixtures, conduits, and wiring.
AvailableNorthampton Township
13 LF Plain Cement Concrete Curb, 6" Height, Including Removal of Existing Curb and Pavement Restoration; 37 LF Plain Cement Concrete Curb, 8" Height, Including Removal of Existing Curb and Pavement Restoration; 69 LF Plain Concrete Mountable Curb, Type A, Including Pavement Restoration; 84 SY Cement Concrete Sidewalk, Including Excavation and Roadside Development; 62 SF Detectable Warning Surface, Polymer Composite; 78 LF AWG 8 Underground Cable, Copper, 1 Conductor; 52 SF Post Mounted Signs, Type B; 20 SF Post Mounted Signs, Type F; 30 SF Structure Mounted Flat Aluminum Signs; 2 ea Rectangular Rapid Flashing Beacon Assembly (Single Sided); 2 ea Rectangular Rapid Flashing Beacon Assembly (Double Sided); 6 ea Flexible Delineator Post, Surface Mount Type SM-1, Yellow Post with Yellow Sheeting; 23 LF of 2" Conduit, PVC; 102 LF of 3" Conduit, PVC; 43 LF Trench and Backfill, Type I; 19 LF Trench and Backfill, Type II; 43 LF Trench and Backfill, Type III; 228 LF Signal Cable, 14 AWG, 3 Conductor; 8 LF of 4" White Hot Thermoplastic Pavement Markings; 186 LF of 4" Yellow Hot Thermoplastic Pavement Markings; 233 LF of 24" White Hot Thermoplastic Pavement Markings; 43 LF of 24" Yellow Hot Thermoplastic Pavement Markings. See attached file.
Posted Date
Dec 1, 2025
Due Date
Jan 19, 2026
Release: Dec 1, 2025
Northampton Township
Close: Jan 19, 2026
13 LF Plain Cement Concrete Curb, 6" Height, Including Removal of Existing Curb and Pavement Restoration; 37 LF Plain Cement Concrete Curb, 8" Height, Including Removal of Existing Curb and Pavement Restoration; 69 LF Plain Concrete Mountable Curb, Type A, Including Pavement Restoration; 84 SY Cement Concrete Sidewalk, Including Excavation and Roadside Development; 62 SF Detectable Warning Surface, Polymer Composite; 78 LF AWG 8 Underground Cable, Copper, 1 Conductor; 52 SF Post Mounted Signs, Type B; 20 SF Post Mounted Signs, Type F; 30 SF Structure Mounted Flat Aluminum Signs; 2 ea Rectangular Rapid Flashing Beacon Assembly (Single Sided); 2 ea Rectangular Rapid Flashing Beacon Assembly (Double Sided); 6 ea Flexible Delineator Post, Surface Mount Type SM-1, Yellow Post with Yellow Sheeting; 23 LF of 2" Conduit, PVC; 102 LF of 3" Conduit, PVC; 43 LF Trench and Backfill, Type I; 19 LF Trench and Backfill, Type II; 43 LF Trench and Backfill, Type III; 228 LF Signal Cable, 14 AWG, 3 Conductor; 8 LF of 4" White Hot Thermoplastic Pavement Markings; 186 LF of 4" Yellow Hot Thermoplastic Pavement Markings; 233 LF of 24" White Hot Thermoplastic Pavement Markings; 43 LF of 24" Yellow Hot Thermoplastic Pavement Markings. See attached file.
AvailableCity of Lynnwood
Provide construction management/construction administration (cm/ca) services associated with the city s upcoming pedestrian and bicycle improvement project.
Posted Date
Nov 26, 2025
Due Date
Dec 17, 2025
Release: Nov 26, 2025
City of Lynnwood
Close: Dec 17, 2025
Provide construction management/construction administration (cm/ca) services associated with the city s upcoming pedestrian and bicycle improvement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →