Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
WTP Clarifier Bearing Replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Professional consulting services for the design of the replacement of the Old Greensboro Road Bridge over Brushy Fork Creek in Winston-Salem, North Carolina.
Posted Date
Dec 15, 2026
Due Date
Jan 27, 2026
Release: Dec 15, 2026
Close: Jan 27, 2026
Professional consulting services for the design of the replacement of the Old Greensboro Road Bridge over Brushy Fork Creek in Winston-Salem, North Carolina.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide Professional consulting services to design the replacement. replacement project which will include a new two span bridge with two 12’ lanes of travel for vehicles, two 5’ bicycle lanes, a 2’ buffer between the vehicle and bicycle lanes, two 6’ sidewalks with curb, and a black two-bar metal barrier rail.
Posted Date
Dec 15, 2025
Due Date
Jan 27, 2026
Release: Dec 15, 2025
Close: Jan 27, 2026
Provide Professional consulting services to design the replacement. replacement project which will include a new two span bridge with two 12’ lanes of travel for vehicles, two 5’ bicycle lanes, a 2’ buffer between the vehicle and bicycle lanes, two 6’ sidewalks with curb, and a black two-bar metal barrier rail.
AvailableProcurement of professional engineering services for the design and preparation of construction documents for the replacement of the Old Stagecoach Road Bridge (116015) over Unnamed Stream, including survey, environmental permits, and construction administration.
Posted Date
-
Due Date
Feb 26, 2026
Close: Feb 26, 2026
Procurement of professional engineering services for the design and preparation of construction documents for the replacement of the Old Stagecoach Road Bridge (116015) over Unnamed Stream, including survey, environmental permits, and construction administration.
AvailableReplacement of Bridge
Posted Date
-
Due Date
Feb 2, 2026
Release: -
Close: Feb 2, 2026
Replacement of Bridge
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →