Closing soon

Oil Dock 3 South Sump Improvements (Request for Quote)

Description: The project scope generally consists of demolishing the existing sump float system at Oil Dock 3 South and replacing it with a level transmitter and local level controller, as detailed in Part B, CC Barge Dock Connection for Asphalt, Sump Level Upgrade Package, and included in this document. The sump piping will be modified as part of the installation of the instruments.

Buyer
Port Of Corpus Christi Authority

SpecialDistrict · TX, US

Released
Sep 9, 2026
Closes
Sep 16, 2026(3 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts