Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
4 EA Ohmite - wirewound resistors - chassis mount 15w 10 ohm, no subs or alts, ohmite p/n: hs15 10r f mouser p/n: 284-hs15-10f.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Cab & chassis for master agreement.
Posted Date
Jan 20, 2026
Due Date
Feb 3, 2026
Release: Jan 20, 2026
Close: Feb 3, 2026
Cab & chassis for master agreement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide 3 EA freightliners with CNG chassis with utility body, Epto and hybrid 60' reach, insulated, articulated and telescopic aerial lift with material handler jib.
Posted Date
Jan 6, 2026
Due Date
Jan 29, 2026
Release: Jan 6, 2026
Close: Jan 29, 2026
Provide 3 EA freightliners with CNG chassis with utility body, Epto and hybrid 60' reach, insulated, articulated and telescopic aerial lift with material handler jib.
Available2026, 19,000 gvwr, crew cab, 4x4 cab chassis.
Posted Date
Jan 13, 2026
Due Date
Jan 30, 2026
Release: Jan 13, 2026
Close: Jan 30, 2026
2026, 19,000 gvwr, crew cab, 4x4 cab chassis.
AvailableNSNs: 6625-01-501-4557 NSNs: 6625-01-501-4557 Chassis Plug In Unit, 6625-01-567-2757 PN: N1912A-OPTH01 Wattmeter, 5693-01-442-5287 PN: E1412A Electronic Module Standardize, 6625-01-572-9440 PN: E4440A-111-117-123-124-215-HB2-H Spectrum Analyzer, 6625-01-576-8903 PN: E8257D-520-007-1E1-UNT-UNW-HSM Signal Generator, 5998-01-600-4997 PN: Z2090-66513 Circuit Car Assembly, 5998-01-600-4397 PN: Z2091-67912 Aircraft MA Fixture, 4920-01-600-0136 Z2091-67917 Interface Dev, Panel, 4920-01-587-7741 PN: Z2091B-104 Stimulus Distribution Assembly (SDA), 6625-01-567-2761KV PN: N1921A-106,C35 Power Sensor, 4920-01-588-0516 PN: Z2091B-105 Interface Device Panel, 4920-01-603-7174 PN: Z2091-67909 A/C Maintenance Fixture, 4920-01-603-7175 PN: Z2091-67907 Aircraft Maintenance Fixture to ensure full compatibility on the F-15 Tactical Electronic Warfare System (TEWS) Intermediate Support System (TISS).
Posted Date
Jan 23, 2026
Due Date
Feb 23, 2026
Release: Jan 23, 2026
Close: Feb 23, 2026
NSNs: 6625-01-501-4557 NSNs: 6625-01-501-4557 Chassis Plug In Unit, 6625-01-567-2757 PN: N1912A-OPTH01 Wattmeter, 5693-01-442-5287 PN: E1412A Electronic Module Standardize, 6625-01-572-9440 PN: E4440A-111-117-123-124-215-HB2-H Spectrum Analyzer, 6625-01-576-8903 PN: E8257D-520-007-1E1-UNT-UNW-HSM Signal Generator, 5998-01-600-4997 PN: Z2090-66513 Circuit Car Assembly, 5998-01-600-4397 PN: Z2091-67912 Aircraft MA Fixture, 4920-01-600-0136 Z2091-67917 Interface Dev, Panel, 4920-01-587-7741 PN: Z2091B-104 Stimulus Distribution Assembly (SDA), 6625-01-567-2761KV PN: N1921A-106,C35 Power Sensor, 4920-01-588-0516 PN: Z2091B-105 Interface Device Panel, 4920-01-603-7174 PN: Z2091-67909 A/C Maintenance Fixture, 4920-01-603-7175 PN: Z2091-67907 Aircraft Maintenance Fixture to ensure full compatibility on the F-15 Tactical Electronic Warfare System (TEWS) Intermediate Support System (TISS).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →