Rhode Island Department of Transportation
State AgencyRI
Posted
Aug 31, 2026
Sep 29, 2026
Providence Pedestrian Bridge over Amtrak
Work includes consists of finishing the construction of the pedestrian bridge. Repairing the concrete piers on bridge. Repairing the joint on bridge. Installing a bike path counter, and installing an overhead sign. Description: 720 SY of clearing and grubbing; 15 SY of remove and dispose sidewalks; 25 ton of handle, haul, and stockpile management of contaminated soils and unclassified soils; 25 ton of load and haul contaminated soil, type 2; 25 ton of disposal of contaminated soil, type 2; 25 CY of structural excavation earth; 160 SF of temporary steel sheeting; 1960 LF of compost filter sock; 4 EA of sack insert inlet protection; 1 EA of construction accesses standard 9.9.0.