Corridor - Ashaway
Jul 31, 2026
Closes
Aug 28, 2026
Project consists of 3 bridge replacements. Description: 2 EA of remove and dispose highway bounds; 425 LF of remove and dispose pipe - all sizes; 725 LF of remove and dispose guardrail and post all types; 54 SY of removal and disposal of pavement; 14 EA of remove and dispose frame and grate or frame and cover; 7 EA of remove and dispose headwall; 820 LF of removal and disposal of curbing; 8 EA of removal and disposal of drainage and utility structures; 15 LF of removal and disposal of fences and railings; 11 EA of remove and dispose directional, warning, regulatory, service, and street signs; 1 LS of remove and stockpile bridge closure traffic devices; 2370 CY of earth excavation. See attached file.