Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of work for bid package c includes hvac replacement in the aquarium sciences building and hvac control systems at occc campus buildings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of full replacement of roofing, door frame and flooring work.
Posted Date
Jan 13, 2026
Due Date
Jan 29, 2026
Release: Jan 13, 2026
Close: Jan 29, 2026
Project consist of full replacement of roofing, door frame and flooring work.
AvailableBid packages include: BP-05.1 - Structures; BP-21.1 - Fire sprinkler; BP-22.1 - Mechanical; BP-26.1 - Electrical; BP-31.1: - Earthwork & utilities; BP-32.1 - Landscape & irrigation.
Posted Date
Jan 7, 2026
Due Date
Jan 29, 2026
Release: Jan 7, 2026
Close: Jan 29, 2026
Bid packages include: BP-05.1 - Structures; BP-21.1 - Fire sprinkler; BP-22.1 - Mechanical; BP-26.1 - Electrical; BP-31.1: - Earthwork & utilities; BP-32.1 - Landscape & irrigation.
AvailableWork consists of Bid Packages Bp-03 Masonry, Bp-12 Metal Siding, & Bp-13 Roofing.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Work consists of Bid Packages Bp-03 Masonry, Bp-12 Metal Siding, & Bp-13 Roofing.
AvailableHoffman Construction, the CM/GC for the City of Boise’s West Boise Water Renewal Facility, is soliciting sub‑bid proposals for Bid Package #7 – Secondary Capacity Expansion Package 2. The scope includes concrete, metals, rough carpentry, roof hatches and specialties, thermal and moisture protection, doors/frames/hardware, rolling doors, coatings, mechanical/process/HVAC, electrical and instrumentation & controls, and earthwork/sitework. A pre‑bid meeting is scheduled for January 29, 2026 at 1:00 PM MST, and sealed bids are due February 19, 2026 at 2:00 PM MST via SmartBid or hand delivery.
Posted Date
-
Due Date
Feb 19, 2026
Release: -
Close: Feb 19, 2026
Hoffman Construction, the CM/GC for the City of Boise’s West Boise Water Renewal Facility, is soliciting sub‑bid proposals for Bid Package #7 – Secondary Capacity Expansion Package 2. The scope includes concrete, metals, rough carpentry, roof hatches and specialties, thermal and moisture protection, doors/frames/hardware, rolling doors, coatings, mechanical/process/HVAC, electrical and instrumentation & controls, and earthwork/sitework. A pre‑bid meeting is scheduled for January 29, 2026 at 1:00 PM MST, and sealed bids are due February 19, 2026 at 2:00 PM MST via SmartBid or hand delivery.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →