Oak Street Waterline Improvements
Work inlcudes 1,900 LF furnish and install complete, 8" c900 waterline; 80 LF furnish and install complete, 8" c900 waterline (rj) with 16" steel casing; 2 EA furnish and install complete, 8" gate valves; 6 EA furnish and install complete, 6" gate valves; 1 EA furnish and install complete, 6" hydrant; 1,980 LF furnish and install complete, tracer wire; 2 LS connection to existing waterline; 133 SY type f pavement replacement w/ compacted granular backfill; 15 SY type c pavement replacement w/ low strength mortar backfill. See attached file.