Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
NSNS: 1560012672365FJ 1560012675423FJ P/N: 160D41200-18 AND -17 Noun: Aircraft Fairing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Demolition of the water filtration plant; construction of a new intermediate and high lift pump station (IHLPS) on the site of the demolished center clearwell; construction of a new south reservoir on the site of the demolished south clearwell; construction of a new north reservoir on the site of the demolished north clearwell; installation of new WFP emergency generators and generators' switchgear; replacement of low lift pumps and piping, electrical systems, and building mechanical systems in the LL-HSPS; replacement of low lift pump drives in the backup low lift pump station; installation of flow meter vault improvements; installation of CT/BWS basin improvements; installation of buried piping and electrical ductbank; installation of modifications to the WFP supervisory control and data acquisition (SCADA) system; installation of a new storm water outfall to lake; WFP site fencing, surface restoration and landscaping.
Posted Date
Nov 26, 2025
Due Date
Jan 22, 2026
Release: Nov 26, 2025
Premium
Access the largest public sector contact database
Close: Jan 22, 2026
Demolition of the water filtration plant; construction of a new intermediate and high lift pump station (IHLPS) on the site of the demolished center clearwell; construction of a new south reservoir on the site of the demolished south clearwell; construction of a new north reservoir on the site of the demolished north clearwell; installation of new WFP emergency generators and generators' switchgear; replacement of low lift pumps and piping, electrical systems, and building mechanical systems in the LL-HSPS; replacement of low lift pump drives in the backup low lift pump station; installation of flow meter vault improvements; installation of CT/BWS basin improvements; installation of buried piping and electrical ductbank; installation of modifications to the WFP supervisory control and data acquisition (SCADA) system; installation of a new storm water outfall to lake; WFP site fencing, surface restoration and landscaping.
AvailableP/n: 16VK016-803 cord, detonating, 1377-010739445ES 17/ 15 ALT 1377-015226393ES 12/7, 1377-010568642ES 18/11 ALT 1377-015226391ES 11/6, 1377-010568643ES 18/11 ALT 1377-015226387ES 11/7, 1377-010739444ES 17/12 ALT 1377-015226388ES 12/7.
Posted Date
Nov 30, 2022
Due Date
Nov 30, 2027
Release: Nov 30, 2022
Close: Nov 30, 2027
P/n: 16VK016-803 cord, detonating, 1377-010739445ES 17/ 15 ALT 1377-015226393ES 12/7, 1377-010568642ES 18/11 ALT 1377-015226391ES 11/6, 1377-010568643ES 18/11 ALT 1377-015226387ES 11/7, 1377-010739444ES 17/12 ALT 1377-015226388ES 12/7.
AvailableProvide Six (6) Gentex Corporation helmet systems and components HGU 55/P Helmet w/ Standard MBU-20/P Visor, 8475-01-542-2571 Large / P/N: 81D5330-17, 8475-01-542-2562 Medium / P/N: 81D5330-16, 8475-01-542-2576 Extra-Large / P/N: 81D5330-18, Total Best Estimated Quantity: 9,028 each The resultant contract will have a five (5) year ordering period See outside link
Posted Date
Dec 3, 2025
Due Date
Jan 6, 2026
Release: Dec 3, 2025
Close: Jan 6, 2026
Provide Six (6) Gentex Corporation helmet systems and components HGU 55/P Helmet w/ Standard MBU-20/P Visor, 8475-01-542-2571 Large / P/N: 81D5330-17, 8475-01-542-2562 Medium / P/N: 81D5330-16, 8475-01-542-2576 Extra-Large / P/N: 81D5330-18, Total Best Estimated Quantity: 9,028 each The resultant contract will have a five (5) year ordering period See outside link
AvailableThe Defense Logistics Agency (DLA) Land and Maritime seeks to procure O-Ring components (NSNs 5331013488331 and 2530015308481) under FAR Part 15 via a limited-sources competitive procurement. The award will be a firm-fixed-price IDIQ long-term contract (base 3 years + two 1-year options) with a maximum value of $1,619,938.24 and delivery to CONUS locations. This is a Total Small Business set-aside and is designated as a limited-source procurement under 10 U.S.C. 2304(c)(1); interested parties must notify the Contracting Officer of interest/capability within 15 days (by Dec 17, 2025), with the full solicitation expected on DLA's DIBBS portal on or about Dec 18, 2025.
Posted Date
Dec 2, 2025
Due Date
Dec 19, 2025
Release: Dec 2, 2025
Close: Dec 19, 2025
The Defense Logistics Agency (DLA) Land and Maritime seeks to procure O-Ring components (NSNs 5331013488331 and 2530015308481) under FAR Part 15 via a limited-sources competitive procurement. The award will be a firm-fixed-price IDIQ long-term contract (base 3 years + two 1-year options) with a maximum value of $1,619,938.24 and delivery to CONUS locations. This is a Total Small Business set-aside and is designated as a limited-source procurement under 10 U.S.C. 2304(c)(1); interested parties must notify the Contracting Officer of interest/capability within 15 days (by Dec 17, 2025), with the full solicitation expected on DLA's DIBBS portal on or about Dec 18, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis