CityAL
Posted
Oct 21, 2026
Nov 16, 2026
Elm Street Bridge Rehabilitation RFP
Bridge Rehabilitation.
Description: Additions and Alterations to Elm Street Elementary School. Separate Bids are requested for the following Contracts: General, Plumbing, Mechanical, Electrical, Food Service.
SchoolDistrict · NY, US
Adjacent opportunities open for bidding right now.
CityAL
Posted
Oct 21, 2026
Nov 16, 2026
Bridge Rehabilitation.
CityIA
Posted
Oct 28, 2026
Nov 13, 2026
Removal and lawful disposal of demolition debris and foundation, including site grading.
CityVT
Posted
Nov 2, 2026
Nov 23, 2026
Prequalification for Replacement of an existing water main line along Elm Street in Woodstock, Vermont. Specifically, the work will include trenching, removal of the existing asphalt and subbase, installation of water main, thrust blocks, valves, securing insulated water main attached the existing bridge substructure, installation of roadway base and pavement patch and associated site work, sandblasting, cleaning, and painting of the bridge substructure.
CityTX
Posted
Oct 1, 2026
Nov 19, 2026
Work includes removing concrete (curb & gutter) 523 LF; cement TRT (mix existing material) (8" to 10") 144,871 SY; d-gr hma ty-d pg64-22 (1.5") (wearing surface) 12,280 ton; d-gr hma ty-d pg764-22 (1.5") (level-up) 12,162 ton; repair of flexible pavement (8" asb) 1,059 sy; plane asph conc pav (1" to 3") 3,530 SY; plane acp (1" to 3") (skid steer mounted equipment) 7,568 SY; mobilization; barricades, signs & traffic handling; conc curb & gutter (ty ii) (6") 523 LF; intersections, driveways, and turnouts (acp) 1,881 ton; refl pav mrk ty i (yellow) (6") (solid) (100 mil) (no sealer required) 4,554 LF; refl pav mrk ty i (yellow) (6") (broken) (100 mil) (no sealer required) 1,010 LF; refl pav mrk ty i (white) (24") (solid) (100 mil) (no sealer required) 10 LF, see outside link.
Decision makers connected to this RFP from Waverly Central School District.
From the first pre-RFP signals to the published RFP and its files.
Proposed budget
The proposed FY2026-27 budget includes a Capital Outlay Exception project for electrical renovations at Elm Street Elementary School, covering the stadium audio, power distribution and low-voltage data systems.
Capital $9,427,992 19.87% The Capital Component includes all transportation capital, debt service and lease expenditures; and costs resulting from court judgments, administrative orders, settled or compromised claims. It also includes all facilities costs of the district, includ- ing facility lease expenditures, annual debt service and total debt for all…
Waverly Central School District FY2026-27 Proposed Budget
Proposed budget · Jul 1, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (1 days left)